Laserfiche WebLink
CONTACT INFO <br />KIKO ANTIiNOVICH, PE <br />kiko.amunovlohGnv@,cam <br />Project Engineer <br />gi:neer <br />EXPERIENCE <br />Mr,Antunovloh.has more t...,..,.... ....... .. .... ............. <br />rs , ., vi . <br />hanthree years of experianca as a tilvll engineer, fills <br />3 years <br />professional experience fnoludas Projectengineer, design engineer and CAD designer. <br />EDUCATION <br />He Is adopt at managing multiple municipal and agency projects, His qualifications <br />63, Civil, Engineering <br />Include the ability to design and draft complex water and wastewater projects including <br />LICENSES <br />reservoirs, pump stations, water mains and sewer pipelines, <br />Civil Engineer (CA) <br />Project Experience. <br />No, 87904 <br />:........ :...:....... ..:: <br />Paseo De Valencia LlftStation Rehabilitation " <br />MOULTON NIGUEL WATER DISTRICT I LAGUNA HILLS, CA <br />Project Engineer, Mr. Antunovich is providing project engineering to develop plans <br />to replace aging pumps and motors to Increase system relabiitY, update and replace <br />aged'eiectdoal equipment, retrofit piping, rehabilitate facility for better ventilation, and <br />legal descriptions and plats. <br />Corryns and Slauson Area Main Replacements and Abandonment <br />GOLDEN STATE WATER COMPANY f CULVER CITY, CA <br />Project Engineer. Mr, ATfunovieh Is acting ae project engineer to develop plans and <br />specifloations forte design of a potable water pipeline replacement project located <br />in its Culver City Water System. This prgeet Includes raplacnig abandoning 1,600 <br />.and <br />LF of undersized and old 4-Inch, 6-inch, and 10-inch cast Iron water mains with 8-inch <br />and 12-Inch PVC in the public right of way (ROW), The purpose of this project Is to <br />Improve water quality, Increase fire flows, reduce maintenance costs, and Improve <br />system reliability within the GSWC service area. This projeot Is ,at to be constructed Ih <br />5 sequences. <br />Azusa Sewer Lift Station <br />CITY DP WEST COVINA I WEST COVINA, CA <br />Project Engineer. Mr, Antunovich is acting as project engineer to develop piens to <br />upgrade the exiting sewer pumps and controls to comply with the Statewide General <br />Waste Discharge Requirements for sanitary Sewer Systems, provide sufficient storage <br />capacity during emergency/power outages; provide backup power systems; and SCADA <br />monitoringsyatem to pump date and status, <br />Alley Water Main Conversion, Liberty Court <br />LONG BEACH WATER DEPARTMENT I LONG BEACH, CA <br />Lead Designer, Mr. Antunovich designed and drafted the plans for the project. This <br />Project included the relocation Of two waterlines and approximately 26 servioes within <br />two alleys to the adjacent streets, The project consisted of the design of approximately <br />3750 LFof $-inch DI pipe and 600' LF of 4-inch DI pipe, The project required extensive <br />field Investigation and coordination between the Long Beach Water Department <br />N V 5 and property owners: The project construction was also split between the Water <br />Department constructing the pipe In the side streets and the contractor constructing <br />the main within Atlantic Ave and reconnecting the service laterals, <br />