Laserfiche WebLink
PAUL M. FRISL1E, PE, IM5A <br />Senior Engineer <br />EDUCATION <br />• MBA,. Leriverslty, of Phoenix, 2011 <br />• AS, Civil[nginearing, University of <br />California, bvine, 2008 <br />RMSTHATIONS <br />o Civil Ellginear(PEE <br />- CA n72982, 2008 <br />. Internaimmal Municipal Signal <br />Association (IM5A), <br />Traffic Signal Level 11, gB097789, <br />2012 <br />'Traffic Signal Level I, NAA97189, <br />2012 <br />Signal Inspector level 1, <br />4SI97189, 2014 <br />Work Zone Safety, UZZ97189, <br />2010 <br />PEARS Of EXPERIENCE 17 <br />CURE COMPf.TENC I KS <br />TrafficFnginasringg Operations <br />• ITS Planning, Design &Imeelumen <br />• Traffic Signal Design <br />= Construction Assistance <br />Transit <br />AFFILItA1 CINS <br />Orange County Traffic Engineering <br />Council(OCT€C) <br />ire m <br />Mr. POOP serves as a Senior Engineer Of IterW Transportation Systems division and <br />has been with firm Since January 200L For over 17 years, Mr. Prislia has been <br />'ja- wo„ eo uc>,an anu acpioymenl pr n A Systems Integration, and traffic <br />esign.Recently, he has served as the Project Manager for the amorous <br />W Arterial Improvement Project, Cypress Phase i through 3ITS Projects, the <br />,per Beach ITS Phase 5 through 8 Projects, the Santa 101111 ATMS Phase 41 <br />II: He has tire been the Lead Design Engineer for the development of design <br />For the o"man di ITS Master Firm Design project, Vaudurn Avenue Arterial <br />vensent Project, the Santa Mantra ALMS 421 Prelect, SR-710ITS Design <br />a, Newport Beach ITS Phase 1, 2, 3, 4 and 7 Projects and the Fountain valley <br />IV project, as well as the Signal Construction Inspector for completion of the <br />d ITS Master Mantua the hosedrans and Vermont Arterial In mroveracm, <br />Project Experience <br />Harbor Boulevard I toffIC Signal Synchronization (T55) Project - 0;ange <br />County Trnnsportathan Authority (C)CTA) and City of Santa Ana, CA <br />Mr. Make served as QA/QC lead B11d CONSOLIcter, Manager to provide <br />construction support and perform all necesxary integration, <br />Implementation, and fine Suning tasks for the Harbor Blvd TSS project. <br />This project involved Signal synchronization and equipment upgrade along <br />Harbor Blvd from Chapman Ave to Newport Blvd, spanning across the <br />Cities of Garden Grove, Santa Ana, Fountain Valley and Costa Mesa, as <br />well as freeway nn/off ramps at SR-22 and 1,405 withintaltrans <br />jurisdiction. In addition to generating PS'&E packages for equipment <br />upgrades, the project also Included the development, implementation <br />and fine-tuning of the AM, PM, midday, off-peak and weekand traffic <br />signal coordination timing plans for all 46 Intersections along the corridor. <br />halls Will also provide Traffic Management Center (TMC) upgrades to the <br />cities of Costa Mesa and Santa And, winch spans from Closed-circuit <br />'EQuVISIOn (CCTV) firmness and workstations to designing and replacing the <br />CRYS existing video wall system with newer and more advanced <br />capabilities. <br />Barranta Pkxvy(Mmrlands Blvd Regional Traffic Signal Synchronization <br />Project - Cities of Irvine, Lake Forest & Mission Viejo, CA <br />Mr. Frisfie Is the QA/QC Leader to provide traffic/ITS design improvements <br />and traiiicsignal synchronization for 44 Intersections along a 7.3-mile <br />segment Of Women Parkway/Muidands Blvd. The project involves design <br />of now Neer optic cables (mufti and single mode,), conduits, pull boxes, <br />Cabinets and controller upgrade in City of ovine; New conduits, pull boxes, <br />twisted pair interconnect, and wireless radio in City of Lake Forest; New <br />cabinets, pedestrian signals and loop detection in City of Mission Viejo. In <br />addition to the traffic signal Infrastructure Improvements, fonds also <br />develops signal coordination plats for AM, noon, off-peak, Pro,'aftm, <br />hours" and weekend for ail project traffic signals along the corridor. <br />Newport/Balboa Boulevard Regional Traffic Signal Synchronization <br />Project - Cities of Costa Mesa and Newport Beach, CA <br />Mr, prlshe serves as the QA/QC leader and Enginoer of Record to CSCTA to <br />Provide turro-key, traffic(ITS Improvements and traffic signal synchronization <br />for 33 Intersections along Newport/Balboa Boulevard corridor from Bristol <br />Street in Costa Mesa to Main Street in Newport Brach. <br />Innovating Through Infnrinatics1m <br />