PAUL M. FRISL1E, PE, IM5A
<br />Senior Engineer
<br />EDUCATION
<br />• MBA,. Leriverslty, of Phoenix, 2011
<br />• AS, Civil[nginearing, University of
<br />California, bvine, 2008
<br />RMSTHATIONS
<br />o Civil Ellginear(PEE
<br />- CA n72982, 2008
<br />. Internaimmal Municipal Signal
<br />Association (IM5A),
<br />Traffic Signal Level 11, gB097789,
<br />2012
<br />'Traffic Signal Level I, NAA97189,
<br />2012
<br />Signal Inspector level 1,
<br />4SI97189, 2014
<br />Work Zone Safety, UZZ97189,
<br />2010
<br />PEARS Of EXPERIENCE 17
<br />CURE COMPf.TENC I KS
<br />TrafficFnginasringg Operations
<br />• ITS Planning, Design &Imeelumen
<br />• Traffic Signal Design
<br />= Construction Assistance
<br />Transit
<br />AFFILItA1 CINS
<br />Orange County Traffic Engineering
<br />Council(OCT€C)
<br />ire m
<br />Mr. POOP serves as a Senior Engineer Of IterW Transportation Systems division and
<br />has been with firm Since January 200L For over 17 years, Mr. Prislia has been
<br />'ja- wo„ eo uc>,an anu acpioymenl pr n A Systems Integration, and traffic
<br />esign.Recently, he has served as the Project Manager for the amorous
<br />W Arterial Improvement Project, Cypress Phase i through 3ITS Projects, the
<br />,per Beach ITS Phase 5 through 8 Projects, the Santa 101111 ATMS Phase 41
<br />II: He has tire been the Lead Design Engineer for the development of design
<br />For the o"man di ITS Master Firm Design project, Vaudurn Avenue Arterial
<br />vensent Project, the Santa Mantra ALMS 421 Prelect, SR-710ITS Design
<br />a, Newport Beach ITS Phase 1, 2, 3, 4 and 7 Projects and the Fountain valley
<br />IV project, as well as the Signal Construction Inspector for completion of the
<br />d ITS Master Mantua the hosedrans and Vermont Arterial In mroveracm,
<br />Project Experience
<br />Harbor Boulevard I toffIC Signal Synchronization (T55) Project - 0;ange
<br />County Trnnsportathan Authority (C)CTA) and City of Santa Ana, CA
<br />Mr. Make served as QA/QC lead B11d CONSOLIcter, Manager to provide
<br />construction support and perform all necesxary integration,
<br />Implementation, and fine Suning tasks for the Harbor Blvd TSS project.
<br />This project involved Signal synchronization and equipment upgrade along
<br />Harbor Blvd from Chapman Ave to Newport Blvd, spanning across the
<br />Cities of Garden Grove, Santa Ana, Fountain Valley and Costa Mesa, as
<br />well as freeway nn/off ramps at SR-22 and 1,405 withintaltrans
<br />jurisdiction. In addition to generating PS'&E packages for equipment
<br />upgrades, the project also Included the development, implementation
<br />and fine-tuning of the AM, PM, midday, off-peak and weekand traffic
<br />signal coordination timing plans for all 46 Intersections along the corridor.
<br />halls Will also provide Traffic Management Center (TMC) upgrades to the
<br />cities of Costa Mesa and Santa And, winch spans from Closed-circuit
<br />'EQuVISIOn (CCTV) firmness and workstations to designing and replacing the
<br />CRYS existing video wall system with newer and more advanced
<br />capabilities.
<br />Barranta Pkxvy(Mmrlands Blvd Regional Traffic Signal Synchronization
<br />Project - Cities of Irvine, Lake Forest & Mission Viejo, CA
<br />Mr. Frisfie Is the QA/QC Leader to provide traffic/ITS design improvements
<br />and traiiicsignal synchronization for 44 Intersections along a 7.3-mile
<br />segment Of Women Parkway/Muidands Blvd. The project involves design
<br />of now Neer optic cables (mufti and single mode,), conduits, pull boxes,
<br />Cabinets and controller upgrade in City of ovine; New conduits, pull boxes,
<br />twisted pair interconnect, and wireless radio in City of Lake Forest; New
<br />cabinets, pedestrian signals and loop detection in City of Mission Viejo. In
<br />addition to the traffic signal Infrastructure Improvements, fonds also
<br />develops signal coordination plats for AM, noon, off-peak, Pro,'aftm,
<br />hours" and weekend for ail project traffic signals along the corridor.
<br />Newport/Balboa Boulevard Regional Traffic Signal Synchronization
<br />Project - Cities of Costa Mesa and Newport Beach, CA
<br />Mr, prlshe serves as the QA/QC leader and Enginoer of Record to CSCTA to
<br />Provide turro-key, traffic(ITS Improvements and traffic signal synchronization
<br />for 33 Intersections along Newport/Balboa Boulevard corridor from Bristol
<br />Street in Costa Mesa to Main Street in Newport Brach.
<br />Innovating Through Infnrinatics1m
<br />
|