CONTACTINIF3
<br />KEVIN MCHUGH, Jr,, PLS
<br />kev1n,mahugh0nv5.&qm
<br />Surveying Project manager
<br />"PVRImE
<br />................... -1 ..................... .. . .........•........ ........... ...... . ...... ...
<br />Mr, McHugh Is a licensed l0ndsUeveyorwith More than SS years of experience. Kevin
<br />I
<br />35 years
<br />manages Nv5's surveying operations In our Southern California Region, As survey manager,
<br />0(h)AT[ON
<br />he supervises all surveying and, MaPPIng operations. This role includes oversight of field
<br />AA Mat statics
<br />surveys, construction $taking, field creWsupervialpri, field and aerial topographic surveys,
<br />the preparation and quality control of final maps, record of surveys, legal descriptions,
<br />right Of way maps, appraisal maps; boundary surveys and analysis, ALTA surveys, lot line
<br />Pr6fitSal0qbI;W6d Sorveyor
<br />1. .1 1. - I P,
<br />constraint maps, condominium plans, and oomer records.
<br />-Cl
<br />Project Experience
<br />........... 1 ................. "! ............ ...... . ........ ....... ............ . ...........
<br />$R-261 and SR-241, Eastern Transportation Corridor I Caltrans
<br />Kevin provided all boundary analysis and righitof-way CADD project coordination for
<br />this 2A.TrIligtronsportation corridor project In orange County. His responsibilities
<br />Included supervision and approvel.and preparation of more than 500 legal
<br />....
<br />descriptions and- exhibits for rl9)ht-Of-w0Y a0OVIaltion, He supervised preparation of all
<br />..
<br />appraisal maps, rlght-of-waynnapA records of surveys, survay-control maps, horizontal -
<br />control calculations, and CADD-file Management, Kevin served as the Project manager
<br />for right of way for this challenging project, which covered the full spectrum Of right-
<br />of -way mapping and engineering elements. Under his direction, the right of way/
<br />mapping team ev011.etedtitle report restrictions and prepared prploot Constraint
<br />Maps; developed Property Binders containing all informationI and legal data used to
<br />for appraisals and subsequent paroel acquisitions; prepared legal descriptions and
<br />exhibits for various types of Property rights acquisition including fee acquisitions,
<br />slope, drainage, roadway slid utility easements, ter'lporary construction aesements,
<br />and )Olnt Use Agreements and Consent to Common Use Agreements for more than
<br />50-utility focillitles,
<br />1-4/1-405 and Bake Parkway Interchange I Caltrans
<br />As land surveyor -in -charge for this project, Kevin's duties covered densification of
<br />horizontal and vertical control, design surveys, aerial mapping, right-of-way base
<br />mapping and survey control taps for three miles of design cross sections. We work on
<br />the Project Included preparation of legal description and plats for right- f-W y takes,
<br />and preparation of appraisal maps and right-of-way maps,
<br />Foothill Transportation Corridor- Oso Segment I Caltrans
<br />Provided all boundary analysis and right of way CADD project coordination far the
<br />five mile segment of the Foothill Transportation Corridor project. Responsibilities
<br />included supervision and approval of Preparation of more than 35 legal descriptions
<br />and exhibits for right of way acquisition as well as supervision of preparation of all
<br />appraisal maps, right of way maps, records of, surveys, survey control maps, horizontal
<br />control calculations, and CADD file management.
<br />Newhope Street Expansion I Caltrans
<br />Surveyor in charge responsible for completing the boundary survey and analysis to
<br />determine the existing street right Of way, Coltrane right of my, and private ownership
<br />boundaries, as well as the preparation and overalght of all legal descriptions and
<br />exhibits required for the City of Fountain Valley to acquire the additional necessary
<br />right of way for the project,
<br />
|