COITACTINFo GUILLAUME GAU, PE, GE
<br />} gulliaume.geuQnvs.tom Gaate.Ghnlcal En to r
<br />II a�,00400 g
<br />....... ...
<br />E7Cf ERIEIICP Mr. Gau s experience includes roadways; electric and gas Imes, water pipelines,
<br />1Yaers residential, oommarolal, schools, transportation, rail, landslide remediatlon and
<br />R,dpCATION forensics projects. He also provides Held engineering services and laboratory
<br />M,S. Civil Engineering supervision for the testing and Inspection for concrete, structural steel, masonry, soils,
<br />tijieckeoiYbiceisp;halt, and civil construction.
<br />M.5 Civil t=nginr a '' I I Project Experience
<br />Ganstruatlolt Management. .............................................
<br />LICEN-SSS :, On -Cali Materials Testing and Inspection Services
<br />Clul! 441ria$r(OA) CITY OF'VISALIA I VISALIA, CA.
<br />Na, 70016 Geoteehnioal Eliginear far annual on -call construction materials testing°services for
<br />Geoteohntca(CngirS"asr, CA various Infrastructure Improvement projects comprising geotechnical and material
<br />Ng'2JS6 testing, overlay and resurfacing (Cape seal & Realtamte) projects, utilities farcilects,
<br />Independent Assurance services for federallyfu nded projects, pavement evaluation
<br />services, and concrete atruotures: Materials testing services covered soils, concrete,
<br />HMA, Cape Seals, r0damite, and miscellaneous testing services.
<br />Melrose Chive extension end Irn provelnents
<br />CITY Of OCEANSIDE I OOE,ANSIDE, CA -
<br />Gectechnical Engineer for the design and construction of the extension including
<br />grading recommendations, pavement, Culvert, pipeline, and shoring design.
<br />I State Route 178 Widening Project
<br />CALTRANS I STATE OF CALIFORNIA
<br />Geotechnioal Engineer for field and laboratory materials tester, plant Inspectorand
<br />source inspection services for the widening of SR-178, The project included grading
<br />Observation, field densitytesting, asphalttesting and plant inspection and source
<br />inspection of 112,000 CY roadway excavation and fill placement, 62,000 CY of
<br />j - - aggregate base and subbase and 83,000'ton HMA
<br />C1090 Installation along Highway 79
<br />SAN DIEGO GAS & ELECTrle
<br />i Geoteohnlcal Englneerfor the installation of miles of underground 39kv line to bring
<br />power to the new Jamul casino. Work included excavation monitoring and placement of
<br />structural baokfill, aggregate base and subbase and HMA along Highway 79.
<br />Various Projects
<br />SAN DIEGO GAS & ELECTRIC I SAN DIEGO COUNTY
<br />Geotechnical Engineer for multiple projects Including underground transmission lines,
<br />drilled pler foundation and gas line relocation. Key geological/geotechnical issues
<br />Included deep foundations, rippability studies, seismic refraction surveys, horizontal
<br />dlrectlonal drilling, jack and pore, retaining wails and shoring.
<br />Black Canyon Road
<br />SAN DIEGO COUNTY, CA
<br />Senior Engineer and Project Manager responsible for the geotechnical investigation and
<br />design of a section of roadway between the San Vicente Reservoir and adjacent Indian
<br />Reservation. Key geotechnical issues Included slope stability, rock rippability, retaining
<br />wall and pavement design cnnsicrino nr acnhnii nn.,,.rnty ,.;i.,,,,,„,,,„,, i,-- .
<br />
|