Laserfiche WebLink
CONTACTINVO <br />PETER SALGADO, PE <br />petersa lgado@nv5.dom <br />94D.685.0477 <br />Construction Manager <br />......... ........ <br />With more than 20 years of experience, Mr Salgado has managed and delivered a. <br />EXPERIENCE <br />variety of public works projects Including street Improvements, vertical construction <br />20years <br />and tenant Improvements; parks and landscaping Improvements; and water, sewer, <br />EDUCATION <br />and storm droln Improvements, Working with a variety of agencies, he Is thoroughly <br />8.8, Civil Engi naering <br />familiar with Ioeal, state, and federal procedures. <br />LICENSi <br />PCoj,eOt ExperlenCe <br />Civil Engineer (CA) <br />............ ...... .... ..... :,...,.:...:...,..:.;:.,..:.,,,........,.....,..,.,...,.,...,...,,......,...,.,........:. <br />No, 63a,59 <br />::........,...,.,, <br />STREET IMPROVEMENTS <br />Bellflower Boulevard Pedestrian Enhancements <br />OITY OF 95L.l.FLOWER I Bak -FLOWER, CA <br />Construction Manager. Mr. Salgado managed this$1.2M street traffic signal end <br />parkways Improvements project. The scope of work Included roadway raconsu uetion <br />and resurfacing; reconstruction of sidewalks (inoluding:deporedve paving); driveways, <br />curbs, gutters, Cross gutters, and ADA curb ramps; installation of traffic signals, <br />controller cabinets, and flashing beacon; landscaping and irrigation; and traffic striping <br />and;signago (Including decorative crosswalks:at the intersections), <br />FY2013-2014, and FY 2016-2016 Annual Pavement Rehabilitation <br />CITY OFV'ORBA LINDA I YORBA LINDA,. CA <br />Construction Managaf. Mr,:Salgado managed this $2.5M citywide street improvement <br />program Specifically, the scope of work included reconstruotion of sidewalks, <br />driveways, curb; gutter; and ADA curb ramps; roadwaysectio7 repairs and resurfacing, <br />crack seat and slurry seal; and; traffic striping and signage. <br />Corporate Center Drive. treot Lights 'Project <br />CITY OF POMONA i POMONA. CA <br />Construction Manager. Mr, Salgado managed this $250,000 street lights project <br />that Included the removal and installation of approximately BC street lights in several <br />residential areas. <br />N V 5 <br />FY 2008 through 2016 Annual Citywide & Street Improvemerit Projects <br />CITY OF SANTA MONICA I SANTA MONICA, CA <br />Construction Manager. Mr. Salgado provided construction management, <br />Inspection, and public outreach for this annual citywide project. Work oonaistod of <br />pavement resurfacing of streets and parking lots (including slurry seal end crack <br />seal treatments); full pavement reconstruction; traffic signal modifications; and <br />construction of new sidewalks, driveways and ADA ramps. Key services included all <br />facets of construction managementandinspection Including: utility slid multiple <br />agency coordination; project budget and accounts tracking; engineering plan and <br />specification review; traffic management and control; submittal, schedule, request <br />for Information (RFf), progress payment review and processing; field observation; <br />negotiating and processing change orders; docunent control; and project closeout, <br />which consisted of warranties, guarantees, recommending notices of completion and <br />the release of retention. Total construction cost varied between $1M and $SM. <br />