CONTACTINVO
<br />PETER SALGADO, PE
<br />petersa lgado@nv5.dom
<br />94D.685.0477
<br />Construction Manager
<br />......... ........
<br />With more than 20 years of experience, Mr Salgado has managed and delivered a.
<br />EXPERIENCE
<br />variety of public works projects Including street Improvements, vertical construction
<br />20years
<br />and tenant Improvements; parks and landscaping Improvements; and water, sewer,
<br />EDUCATION
<br />and storm droln Improvements, Working with a variety of agencies, he Is thoroughly
<br />8.8, Civil Engi naering
<br />familiar with Ioeal, state, and federal procedures.
<br />LICENSi
<br />PCoj,eOt ExperlenCe
<br />Civil Engineer (CA)
<br />............ ...... .... ..... :,...,.:...:...,..:.;:.,..:.,,,........,.....,..,.,...,.,...,...,,......,...,.,........:.
<br />No, 63a,59
<br />::........,...,.,,
<br />STREET IMPROVEMENTS
<br />Bellflower Boulevard Pedestrian Enhancements
<br />OITY OF 95L.l.FLOWER I Bak -FLOWER, CA
<br />Construction Manager. Mr. Salgado managed this$1.2M street traffic signal end
<br />parkways Improvements project. The scope of work Included roadway raconsu uetion
<br />and resurfacing; reconstruction of sidewalks (inoluding:deporedve paving); driveways,
<br />curbs, gutters, Cross gutters, and ADA curb ramps; installation of traffic signals,
<br />controller cabinets, and flashing beacon; landscaping and irrigation; and traffic striping
<br />and;signago (Including decorative crosswalks:at the intersections),
<br />FY2013-2014, and FY 2016-2016 Annual Pavement Rehabilitation
<br />CITY OFV'ORBA LINDA I YORBA LINDA,. CA
<br />Construction Managaf. Mr,:Salgado managed this $2.5M citywide street improvement
<br />program Specifically, the scope of work included reconstruotion of sidewalks,
<br />driveways, curb; gutter; and ADA curb ramps; roadwaysectio7 repairs and resurfacing,
<br />crack seat and slurry seal; and; traffic striping and signage.
<br />Corporate Center Drive. treot Lights 'Project
<br />CITY OF POMONA i POMONA. CA
<br />Construction Manager. Mr, Salgado managed this $250,000 street lights project
<br />that Included the removal and installation of approximately BC street lights in several
<br />residential areas.
<br />N V 5
<br />FY 2008 through 2016 Annual Citywide & Street Improvemerit Projects
<br />CITY OF SANTA MONICA I SANTA MONICA, CA
<br />Construction Manager. Mr. Salgado provided construction management,
<br />Inspection, and public outreach for this annual citywide project. Work oonaistod of
<br />pavement resurfacing of streets and parking lots (including slurry seal end crack
<br />seal treatments); full pavement reconstruction; traffic signal modifications; and
<br />construction of new sidewalks, driveways and ADA ramps. Key services included all
<br />facets of construction managementandinspection Including: utility slid multiple
<br />agency coordination; project budget and accounts tracking; engineering plan and
<br />specification review; traffic management and control; submittal, schedule, request
<br />for Information (RFf), progress payment review and processing; field observation;
<br />negotiating and processing change orders; docunent control; and project closeout,
<br />which consisted of warranties, guarantees, recommending notices of completion and
<br />the release of retention. Total construction cost varied between $1M and $SM.
<br />
|