Laserfiche WebLink
CONTAGTINI^O <br />LUANNE BEAN, PE <br />vG,com <br />949.5 8.5be:0a4n77nManager <br />Construction Man �er <br />.. ....,.... <br />EXPERIENCE <br />....... ............ ........ <br />Ms, Bean has more than SOyeals ofexperience in the design end management of <br />30 years <br />water and wastewater projects, Hat teahnica l'skills include structural analysis and <br />EDUCATION <br />design, mechanical analyals, instrumentation and control, the preparation of plans, <br />M,S, Civil Engineering <br />specifications, and cost estimates as well as construction monsgemant. She has <br />I5,9.CIVIIEnginaarin: <br />had various, positions with many,public agencies including the Long Beach Water <br />Department, Victor Valley Wastewater RetknkicnAuthority, Indlo'Water Authority, <br />LICENSES <br />Metropolitan Water Dlstdot, and FEMA, Ms. Dean's technical experience includes largo <br />Civil Engineer (CA) <br />scale public works projeots far capital improvement programs; including construction <br />No.50129 <br />oversight, contract administration,.dooumentcontrol, cost.onidscheduleoontrol, <br />REGISTRATIONS <br />Aualltycontral,structural analysiszanddesign. <br />FEiNAtJPS iI. <br />PrOJOCt Experience <br />i First Responder/ <br />...,.,.. ......... ..,..., .............. <br />Operations Level <br />Alley Water Malin Conversion, Phase II/Lewis Lemoil <br />i DOT Offers. of Bulk <br />and INon^Bulk'HAZMAT <br />LONG BEACH .WATER DEPARTMENT I LONG BEACH, CA <br />construction Manager/inspector. Ms, Bean completed full service Construction <br />Packages <br />Management and inspaotion Services for the Phase 11 Ailey Water Main Conversion <br />project. The services included full time construction observation, materials testing, <br />Nuolear Waste Safety <br />review of Contractor's progress payments, resolution of design issues, shop drawing <br />for Workers <br />review, RN resolution, change order met agetncnt and resolution, meetings, public <br />notifications and LBWD coordination for shutdowns for this project.. Our Construction <br />Management team resolved public camplainfs and problems from the local businesses <br />and residence before they become problems for City Hall and LEWD. Ms, Been also <br />checked NPDESard BMP measures, traffic control, and safety measured during <br />construction. <br />J. W. Johnson Reservoir Facility Valve Replacements and Site <br />Improvements Project <br />LONG BEACH WATER DEPARTMENT I COMPTON, CA <br />Resident Engii veer/Conatruetlon Manager, Ms, Bean was responsible for overseeing <br />this project, which Involved replacement of four underground water main valves, <br />Installation of five storm drain inlets, construction of a containment cell for on indoor <br />above -ground chlorine tank, construction of a large concrete reinforced storage pad, <br />trenching for the installation of electrical conduit, and re -paving of surface areas to <br />allow for proper drainage, <br />Group 12 CIAP Sewer Relining Program <br />LONG BEACI I WATER DEPARTMENT i LONG BEACH, CA <br />Construction Manager. Ms, Bean was the Construction Manager for the Long Beach <br />Water Departments Group 1.2 CIPP sower relining program. This involved providing <br />construction oversight and observation of LBWD's contractor to install almost 1.5,000 <br />of 8"Inoh, 10•inch, and 12Anoh ewed-in•place sower cleaning, pre -lining video, lining, <br />and post -lining video. Point repairs and manhole rehabilitations were also undertaken. <br />Once the installation of the CIPP began, Ms. Bean coordinated with the LEWD for <br />shutting off water services for the various residents and businesses along the sewer <br />line routes, Once ouring was completed, a post lining video was run, followed by re- <br />nstallation of the laterals and top hat installation on select laterals: <br />