CONTAGTINI^O
<br />LUANNE BEAN, PE
<br />vG,com
<br />949.5 8.5be:0a4n77nManager
<br />Construction Man �er
<br />.. ....,....
<br />EXPERIENCE
<br />....... ............ ........
<br />Ms, Bean has more than SOyeals ofexperience in the design end management of
<br />30 years
<br />water and wastewater projects, Hat teahnica l'skills include structural analysis and
<br />EDUCATION
<br />design, mechanical analyals, instrumentation and control, the preparation of plans,
<br />M,S, Civil Engineering
<br />specifications, and cost estimates as well as construction monsgemant. She has
<br />I5,9.CIVIIEnginaarin:
<br />had various, positions with many,public agencies including the Long Beach Water
<br />Department, Victor Valley Wastewater RetknkicnAuthority, Indlo'Water Authority,
<br />LICENSES
<br />Metropolitan Water Dlstdot, and FEMA, Ms. Dean's technical experience includes largo
<br />Civil Engineer (CA)
<br />scale public works projeots far capital improvement programs; including construction
<br />No.50129
<br />oversight, contract administration,.dooumentcontrol, cost.onidscheduleoontrol,
<br />REGISTRATIONS
<br />Aualltycontral,structural analysiszanddesign.
<br />FEiNAtJPS iI.
<br />PrOJOCt Experience
<br />i First Responder/
<br />...,.,.. ......... ..,..., ..............
<br />Operations Level
<br />Alley Water Malin Conversion, Phase II/Lewis Lemoil
<br />i DOT Offers. of Bulk
<br />and INon^Bulk'HAZMAT
<br />LONG BEACH .WATER DEPARTMENT I LONG BEACH, CA
<br />construction Manager/inspector. Ms, Bean completed full service Construction
<br />Packages
<br />Management and inspaotion Services for the Phase 11 Ailey Water Main Conversion
<br />project. The services included full time construction observation, materials testing,
<br />Nuolear Waste Safety
<br />review of Contractor's progress payments, resolution of design issues, shop drawing
<br />for Workers
<br />review, RN resolution, change order met agetncnt and resolution, meetings, public
<br />notifications and LBWD coordination for shutdowns for this project.. Our Construction
<br />Management team resolved public camplainfs and problems from the local businesses
<br />and residence before they become problems for City Hall and LEWD. Ms, Been also
<br />checked NPDESard BMP measures, traffic control, and safety measured during
<br />construction.
<br />J. W. Johnson Reservoir Facility Valve Replacements and Site
<br />Improvements Project
<br />LONG BEACH WATER DEPARTMENT I COMPTON, CA
<br />Resident Engii veer/Conatruetlon Manager, Ms, Bean was responsible for overseeing
<br />this project, which Involved replacement of four underground water main valves,
<br />Installation of five storm drain inlets, construction of a containment cell for on indoor
<br />above -ground chlorine tank, construction of a large concrete reinforced storage pad,
<br />trenching for the installation of electrical conduit, and re -paving of surface areas to
<br />allow for proper drainage,
<br />Group 12 CIAP Sewer Relining Program
<br />LONG BEACI I WATER DEPARTMENT i LONG BEACH, CA
<br />Construction Manager. Ms, Bean was the Construction Manager for the Long Beach
<br />Water Departments Group 1.2 CIPP sower relining program. This involved providing
<br />construction oversight and observation of LBWD's contractor to install almost 1.5,000
<br />of 8"Inoh, 10•inch, and 12Anoh ewed-in•place sower cleaning, pre -lining video, lining,
<br />and post -lining video. Point repairs and manhole rehabilitations were also undertaken.
<br />Once the installation of the CIPP began, Ms. Bean coordinated with the LEWD for
<br />shutting off water services for the various residents and businesses along the sewer
<br />line routes, Once ouring was completed, a post lining video was run, followed by re-
<br />nstallation of the laterals and top hat installation on select laterals:
<br />
|