CONTACTIWO DAN OJEDA, PE
<br />dau iel.ojeda@nv5,00m
<br />949.585,0477 Construotlon Manager
<br />EXPERIENCE Mt. Ojeda is a highly qualified professional engineer with 40years-of experience in
<br />40 years public works and city engineering with various Southern California public agenoies,
<br />EDUCATION He has successfully completed numerous small and large-scale capltal Improvernont
<br />H.S. Civil Engineering projects. He also has extensive experience in land development and permitting; traffic
<br />Construptton Nlanagernant. engineering; transportation planning; and grant Implementation.
<br />certiflcate Program, UCLA As construction manager, Mn 010da'sresponsibilities include construction, oversight;
<br />reviewing project plaits, specifications, and cost estimates, maintaining cost and
<br />LICENSES schedule control including' developing and updating the roaster schedule; managing
<br />Civil Engineer (CA) thebjd/award process; administering ponFu)#2nt and construction contracts;
<br />N°' 3698s overseeing the resident inspection team, as well as materials testing and deputy
<br />inspection teams; oondOoting weekly progress meetings; processing and tracking
<br />Project correspondence and documentation inctuding Reis, sub Mitte19, shop drawings_
<br />and FiFt sr reviewing, evaluating, and negotiadrigoonstruction change orders;
<br />facilitating work releted to warranties; and managing project oloseout.
<br />PkDjeet Experience
<br />................ ........ ....._..,...,..;,,....,.,........... .,,..,,.................. ,..,::;......... .,.,..,....................
<br />...:.....
<br />Citywide Street Rehabilitation
<br />CITY Or WEST COVINA.I WESTCOVINA,.CA
<br />Constructlon'Manager/Ynspentor. Mr. Ojecia provided construction management
<br />and Inspection servioes for a federally funded citywide street rehabilitation project,
<br />The scope of work included roadway reconstruction and resurfacing; reconstruction
<br />Of sidewalks, driveways, curb, gutter, and ADA curb ramps; and traffic signage
<br />and striping, All services were administered in compliance with the Coltrane Local
<br />Assistance Procedures Manual.
<br />Atlantic Avenue (Prom 1.5 Freeway to South City Limits), Federal Project
<br />No, ESPL•5250(013)
<br />CITY OF I_YNWO00 I LYNWOOD, CA
<br />Construction Manager. Mr. Ojeda served as construction manager on this street
<br />ImProventent project. The scope of work included roadway reconstruction and
<br />resurfacing; reconstruction of sidewalks, driveways, curb, gutter, and ADA curb ramps;
<br />and traffic signage and striping. The project was funded with the American Recovery
<br />and ReinvestmentAot'funds.
<br />Abbott Road Improvements, Federal Project STPL,-5250(010)
<br />CITY OF LYNWOOD I LYNWOOD, CA
<br />Construction Manager. Mr. Ojeda served as construction manager on this
<br />federally funded street Improvement project. The scope of work Included roadway
<br />reconstruction and resurfacing; reconstruction of sidewalks, driveways, curb, gutter,
<br />cross gutters, and ADA curb ramps; and traffic signage and striping
<br />Industry Way Improvements
<br />CITY OF LYNWOOD I I.YNWOOD, CA
<br />Construction Manager, Mr, Ojeda served as construction manager on this street
<br />improvement project. The scope of work consisted of roadway reconstruction and
<br />resurfacing; reconstruction of sidewalks, driveways,-curisgUrtaTand ADA curd ramps;
<br />and traffic signage and striping.
<br />
|