cor,rlAcT wo
<br />ROBERT H. DOSSPE
<br />robert-doss@hv$.com
<br />94%585.0477
<br />Construction Manager
<br />11 ... I. -I ..................
<br />EXPERIENCE
<br />1 11- ... .... .i. ... '_ .................. 1-1--11.1.1.1- ....... ...... ........
<br />Mr: Dose has more than 35 Years of eXporlenoe In civil engineering, As a result$.
<br />35 years
<br />oriented project manager, Roberts strengths Inoludestrong analytical skills, proven
<br />EDUCATION
<br />successful negotiating, consistency in quality performance, demonstrated Positive
<br />M.D.AManogement
<br />proactive actions, composure while under pressure, consistency in delivering superior
<br />8,S. Civil Engineering
<br />.service tailored to individual Customer needs, superb leadership traits, organizational
<br />sohedullngand olanhIngskills, oulck problemsolving, work
<br />LICENSES
<br />prioritizing, productivity
<br />maximization, and greotforesIght,
<br />CNII,Eng(neer (CA)
<br />No. 312k
<br />Project EXperlenop
<br />caltrans Resident
<br />Engfneer Academy.
<br />I. -I.- 1.1.,,..z ..... ..... . ....... .............................. I-- ... . .........
<br />City of Stanton PublIo Works DeP ..... ....... . .........
<br />Ortment and Engineering Departnient
<br />CITY OF S IANTON I STANTON, CA
<br />Caltrans Office Engineers
<br />li Works Director and City EagInger, Mr. Doss Managed the Public Works
<br />Academy
<br />Department and Engineering Department for a city with a Population of 40,OQO,
<br />Robert directed personnel, made City Council presentations, Interacted with,public
<br />P u
<br />citizens and controlled a
<br />I budget of over $12 million annually. in addition, Robert
<br />managed the construction of $16 inillion in capital improvement projects, including
<br />design, budgeting, and constrootlom the Projects were cornplOted ahead of schedule
<br />with a 6avIngSdif Iti million dollars,
<br />Beach Boulevard Sound Wall
<br />CITY Or STANTON I STANTON, CA
<br />Construction M01389ef. Mr. Doss, managed this retaining welt and Sound wallconstruction
<br />project that included OIDH piles, The project Involved poured concrete
<br />retaining walls with Masonry sound walls on top of the retaining walls,
<br />State Route 55
<br />CAurRANS; DISTRICT 1.2 —STATE CFCALIFORNIA
<br />Resident Engineer, Mr. Doss oversaw this retaining wall and sound wall freeway
<br />construction project, including 25 CIDH piles, The project involved Poured concrete
<br />retaining walls with masonry sound walls on top of the retaining walls.
<br />State Route 91
<br />CALTRANS DISTRICT 12 - STATE OF CALIFORNIA
<br />Resident Engineer, Mr. Doss oversaw this retaining wall and sound wall freeway
<br />Construction project, including 42 OIDH piles. The project involved Poured concrete
<br />retaining walls with masonry sound walls on top of the retaining walls.
<br />Interstate 5/Red Hill
<br />OAU'RANS DISTRICT 12 —STATE OF CALIFORNIA I ORANGE COUNTY, CA
<br />Resident Engineer, Mr. Doss oversaw this $20M freeway construction project,
<br />including demolition and construction of a new bridge, The project Involved Major night
<br />becauee
<br />work freeway lanes Could only be closed between il p.m. and 5 a,m, This
<br />bridge expansion was a cast-in-plaoe concrete box girder span,
<br />
|