Laserfiche WebLink
cor,rlAcT wo <br />ROBERT H. DOSSPE <br />robert-doss@hv$.com <br />94%585.0477 <br />Construction Manager <br />­11 ... I. -I .................. <br />EXPERIENCE <br />1 11- ... .... ­.i.­ ... ­'­_ .................. 1-1--11.1.1.1- ....... ...... ........ <br />Mr: Dose has more than 35 Years of eXporlenoe In civil engineering, As a result$. <br />35 years <br />oriented project manager, Roberts strengths Inoludestrong analytical skills, proven <br />EDUCATION <br />successful negotiating, consistency in quality performance, demonstrated Positive <br />M.D.AManogement <br />proactive actions, composure while under pressure, consistency in delivering superior <br />8,S. Civil Engineering <br />.service tailored to individual Customer needs, superb leadership traits, organizational <br />sohedullngand olanhIngskills, oulck problemsolving, work <br />LICENSES <br />prioritizing, productivity <br />maximization, and greotforesIght, <br />CNII,Eng(neer (CA) <br />No. 312k <br />Project EXperlenop <br />caltrans Resident <br />Engfneer Academy. <br />I. -I.- 1.1.,,..z ..... ..... . ....... .............................. I-- ... . ......... <br />City of Stanton PublIo Works DeP ..... ....... . ......... <br />Ortment and Engineering Departnient <br />CITY OF S IANTON I STANTON, CA <br />Caltrans Office Engineers <br />li Works Director and City EagInger, Mr. Doss Managed the Public Works <br />Academy <br />Department and Engineering Department for a city with a Population of 40,OQO, <br />Robert directed personnel, made City Council presentations, Interacted with,public <br />P u <br />citizens and controlled a <br />I budget of over $12 million annually. in addition, Robert <br />managed the construction of $16 inillion in capital improvement projects, including <br />design, budgeting, and constrootlom the Projects were cornplOted ahead of schedule <br />with a 6avIngSdif Iti million dollars, <br />Beach Boulevard Sound Wall <br />CITY Or STANTON I STANTON, CA <br />Construction M01389ef. Mr. Doss, managed this retaining welt and Sound wallconstruction <br />project that included OIDH piles, The project Involved poured concrete <br />retaining walls with Masonry sound walls on top of the retaining walls, <br />State Route 55 <br />CAurRANS; DISTRICT 1.2 —STATE CFCALIFORNIA <br />Resident Engineer, Mr. Doss oversaw this retaining wall and sound wall freeway <br />construction project, including 25 CIDH piles, The project involved Poured concrete <br />retaining walls with masonry sound walls on top of the retaining walls. <br />State Route 91 <br />CALTRANS DISTRICT 12 - STATE OF CALIFORNIA <br />Resident Engineer, Mr. Doss oversaw this retaining wall and sound wall freeway <br />Construction project, including 42 OIDH piles. The project involved Poured concrete <br />retaining walls with masonry sound walls on top of the retaining walls. <br />Interstate 5/Red Hill <br />OAU'RANS DISTRICT 12 —STATE OF CALIFORNIA I ORANGE COUNTY, CA <br />Resident Engineer, Mr. Doss oversaw this $20M freeway construction project, <br />including demolition and construction of a new bridge, The project Involved Major night <br />becauee <br />work freeway lanes Could only be closed between il p.m. and 5 a,m, This <br />bridge expansion was a cast-in-plaoe concrete box girder span, <br />