Laserfiche WebLink
CONTACT INFO <br />PETE GOLDINGr PLS <br />� petsgolding�nv6,goni <br />949445.0477 <br />urvey/MaPping <br />............ .:........................ <br />ESPERIENOE <br />yaps <br />.. <br />Mr. Golding: brings 0 years of experiehoo that includes a wide variety of projects <br />in both land development and public works projects. He has completed surveying <br />RYfCEA�IpiJ <br />SA Mrfthetratics <br />projects in California, Nevada and Wisconsin and his expertise Includes hundreds of <br />boundary retracements, many involving the Public <br />. <br />i I [oENS,ES - <br />Land Survey System, GPS surveying, <br />map and ALTA production, arid cpnstrootlon surveying, He has extensive offioa and <br />P(ofasslonakyand <br />field experience supparting'his clients. He has prepared hundreds of plats and legal <br />descriptions. He has prepared andbeen In responsible charge bf.r Parcel <br />Surveyor, CAlI 84i8 <br />any Maps, <br />Final Map$ and Records of Survey. He has also per Ir any-topographic.surveys; <br />by photcgrammdtrio methods as well as by field collection methods. <br />Project Experlence <br />Sunrise Powerlink Project l San Diego Gras & Electric I San Diego <br />County, CA <br />Project manager for survey and acquisltlon drawings for approximately 138 miles of <br />new transmisslon corridors through Sean Diego County Project Included the subdivisl4n <br />Of epproximataly 86 sections through 20townships, Field crows,recovered more than <br />100 GtQ/6LM monUmonts, manyfrom the surveys Performed In the 188Qs. ALTA. <br />surveys were performed on mltfgatlan properties purchased bySDC&E, followed by <br />filing records of survey with the county surveyor, <br />ti'uelcomm Stadium Expansion I Gualc'omm 5tadlum I Sea Diego, CA <br />Project surveyor for topographic surveypfQuaieommstadium and surrounding parking <br />lot and facilities. Set and tied pre -marks to California Coordinate System and to existing <br />stadium Control geometry. Provided additional survey data from fold shots on colulmI,% <br />wells, sating levels. <br />International Boundary Water Commission I US/Mexico Border <br />Responsible for survey projects on the US/Maxico border Involving sewer and drainage <br />' isSUes affecting both countries. Provided survey control for construction of the new <br />sewage Treatment Plant. <br />Beach Restoration I County of San Diego I San Diego, CA <br />Set and tied survey control points for photogrammetric survey of several of San Diego <br />County's beaches Including imperial Beach and north county beaches from t a )olla to <br />Oceanside. After restoration design, provided survey control for fill sand dredged from <br />offshore and pumped onto the beaches. <br />The Crosby Estate I The Crosby Family i Rancho Santa Far, CA <br />Responsible for construction staking at new golf course community in Rancho Santa <br />Fe. The project Included a new golf course, driving range, golf club, tennis and <br />swim club as well as a mix of residential units including single family homes and <br />condominiums. Performed stakingfor new hiking trail aiongtheSan Dieguito River. <br />Navy Clean 11 I Bechtel Corporation I Southern California <br />Survey Manager for projects performed under contract with the Bechtel Corporation for <br />the federal program to remove environmental hazards from mllitery bases throughout <br />Southern California, Much of the work involved GPS Surveying to set up control on the <br />