Laserfiche WebLink
Ms. Monica Suter <br />May 24, 2018 <br />Page 2 <br />We Make a difference <br />coordination of the Project. Other In-house team members include Technical Review, Karl <br />Meler, PE; Constructability Review, .Jerome Ruddins, CCM; Structural ,Engineer, Pablo <br />Sanchez -Duran, PE, SE; Electrical Engineers, glee pang See, PE, LEER AP, and Rich <br />Davis, PE; Environmental Specialist, Alan Ashirnine; and Surveyor, Steve Slocum, PLS. <br />Multi -Discipline Capaballtles, Asa multidiscipline firm, Michael Baker has diverse expertise <br />and depth of resource capabilities to support the team in any area that may be called upon <br />throughout the course of the project, <br />Michael Baker's Legal Department has reviewed the City's Standard Agreement provided in <br />Attachment 2 of the RFP, and requests consideration for changes listed on the following page, <br />We are confident in our ability to provide the City of Santa Ana with timely and cost-effective design <br />solutions. Our local Santa Ana office and close proximity to the City will facilitate quick response for <br />meetings and project requirements, and the City can be assured of our commitment to your needs, <br />If you have any questions or require additional information, please contact me at (949) 330-4275, <br />'na ae@r9bakeHntl.mm or Project Manager, Safe Kamangar, at (949) 330.4138, <br />safe. kamanaar@rnm akerin .corn <br />Respectfully submitted, <br />John Nagle, R.E. 448afaam�ngar,P E. <br />Vice President f Principal -in -Charge Project Manager <br />Enclosure; Proposal (1 original, 4 copies, 1 CO); Fee (separate envelope) <br />