Laserfiche WebLink
Civic. CeaterStormwoterLi t5tictionRenovationDesignServicas . <br />Safa Kamangar, PE, PIMP, CCM, QSD <br />Project Manager <br />Mr. Kamangar, recently joined Michael Baker and brings over 20 s <br />years of experience in water, wastewater, and water reuse, <br />planning, design, and construction management in both the <br />Years of Experience: 20 <br />private and public sectors. His previous experience includes I <br />I <br />design engineering, staff augmentation, on-call contract <br />EducatronlTraining: <br />Ms., 2000, Civil Engineering, <br />consultation, program management, design -build owner 1 <br />University of Tehran <br />representative, construction management, and resident I <br />es., 1997, civil Engineering, <br />engineering. As a design engineer Mr. Kamangar, has <br />Azad university, Iran <br />performed hydraulic calculations, mechanical design, detailed <br />design drawings, development of specifications, site work, and <br />Llofe s <br />field calculations. As a Construction Manager, he has been <br />Professional Engineer, <br />conal Engineer, <br />responsible for construction oversight, schedule management, <br />California, C70118 <br />budget tracking, and contractor negotiations # <br />Project Management <br />Professional (PMP), 1863656 <br />Project Experience $ <br />Certifled Construction Manager, <br />1 <br />6341 <br />Storm Drain Pump Station SD -03, City of Long Beach. <br />Qualified SWPPP Developer <br />Preparing complete design package for upgrading the existing <br />I <br />(QSD), 23059 <br />storm drain pump station SD -03, which included replacing i <br />Envision Sustainability <br />existing pumps with three new each 31,500-gpm verticalj <br />Professional <br />turbine pumps, installing new VFD's, trenchless relining of <br />existing discharge piping, installing new gate valves, and I <br />OSHA 30 -Hour Construction <br />installation of a new 1 -MW gas engine standby generator. <br />outreach Training <br />OSHA 40 -Hour HAZWOPER <br />Paseo De Valencia Sewer Lift Station Rehabilitation. <br />Certification <br />Moulton Niguel Water District. Including removal of existing y <br />Confined space Training <br />pumps and installation of two new pumps, piping and new <br />Honors and awards: <br />electrical components. Project also included evaluation of <br />Recipient of orange County <br />existing wet well structure and lining and recommendations for <br />g <br />structural and lining repairs. I <br />Engineering Council's 2012 <br />1 <br />Young Engineer Award <br />Azusa Avenue Sewer Lift Station. Cit of West Covina. <br />City P <br />Recipient of 013DBIDi Western <br />Region's 2013 Distinction <br />Project included removal of two existing pump stations and i <br />Award <br />constructing a brand new submersible wet well type pump <br />station and controls, including backup generator. Project also I <br />Professional Atrillatlons: <br />included designing a by-pass system and providing sequence I <br />American Public Works <br />of construction. I <br />Association <br />American Society of Civil <br />Tiffany Pump Station. Garden Grove Sanitary District. <br />Engineers <br />Project Manager in charge of design and engineering <br />American waterworks <br />calculations and developing 50%, 90% and final plans and <br />Association <br />specifications for replacing the existing Tiffany sewer pump ; <br />Iranian American society of <br />station, influent gravity lines, and forcemain. <br />Engineers and Architects <br />Orange county water <br />Western Pump Station Replacement. City of Glendale Water <br />Association <br />& Power. Design and Construction Management of GWP's ' <br />Project Management Institute <br />existing pump station including sizing a 200 hp and a 400 hp <br />nwill- <br />I N l'6 N N A T 10 NAI Safe Kamangar, P.E., PMP, CCM, QSD <br />