Civic Center 5tormwaterLift 5tatfon Renovation Design Services
<br />John Nagle,.P,E,
<br />Principal -in -Charge
<br />Mr. Nagle has practiced in the field of civil engineering for many
<br />years and has extensive experience in planning, designing, and
<br />providing construction support services for major water and
<br />wastewater facilities. He has been responsible for the
<br />preparation of numerous construction plans, specifications and
<br />cost estimates for water and sewer pipelines, water pumping
<br />stations, wastewater lift stations, wells, and reservoirs. He has
<br />also prepared master plans for both municipal and private -
<br />sector clients for potable water, sanitary sewer, and recycled
<br />water systems. Mr. Nagle has used his combination of planning
<br />and design experience to prepare capital improvement
<br />programs, condition assessment studies, and engineering
<br />feasibility studies. He is a proven Team Leader and well-
<br />respected Project and Task Manager, committed to delivering
<br />technically sound and innovative design solutions.
<br />Project Experience
<br />Whittler Pumping Plant No. 2 Replacement Project, Pico
<br />Rivera, California. City of Whittier. Project Manager. Michael
<br />Baker provided design engineering services and construction
<br />phase support, including full-time construction management
<br />and inspection services, for the replacement of Whittier Utility
<br />Authority's (WUA) Pumping Plant No, 2, which was originally
<br />constructed in the 1930's. The new PP2 facility includes a new
<br />18.9 -MGD pump station, with 17,500 gpm of pumping capacity
<br />to enable WUA to pump during off-peak periods and reduce
<br />power costs; two 2.2 -MG above -grade steel reservoirs to serve
<br />as the forebay and provide operational storage; a 6,400 -
<br />square -foot pump building, including office space for water
<br />production and pumping plant personnel; new piping and
<br />control valves at off-site reservoirs; and upgraded SCADA and
<br />radio communication facilities throughout the entire WUA
<br />service area.
<br />OC -44 Pipeline Rehabilitation/Replacement Project,
<br />Orange County, California, Mesa Water District Task
<br />Manager. Mesa Water District selected Michael Baker to
<br />complete a Rehabilitation/Replacement Evaluation and
<br />Cathodic Protection Study for the OC -44 Pipeline. The OC -44
<br />pipeline runs approximately 8.6 miles through Orange County
<br />Michael Baker provided a comprehensive plan to investigate
<br />the condition of the existing pipeline, evaluate repair and/or
<br />replacement strategies, and identify permitting and follow-on
<br />technical studies required to implement the recommended
<br />strategy. Final design (PS&E) was prepared for the selected
<br />alternative.
<br />Years of Experience: 31
<br />Eduoation/iraining:
<br />M.S., 1996, Civil Engineering,
<br />Loyola Marymount University
<br />B.S.,1967, Civil Engineering,
<br />Loyola Marymcunt University
<br />LicenseslCeRifi cats ons:
<br />Professional Engineer - Civil,
<br />California, 1991, 46972
<br />Professional Engineer- Civil,
<br />Nevada, 2001, 14762
<br />Professional Engineer- Civil,
<br />Utah, 2009, 7214109-2202
<br />Professional Engineer- Civil,
<br />Arizona, 2009, 49684
<br />Professional Engineer- Civil,
<br />Guam, 2015, CE 1850
<br />Water Rights Surveyor, Nevada,
<br />2001,1101
<br />Professional Affiliattons:
<br />American Public Works
<br />Association, Southern
<br />California Chapter, Member
<br />American Society of Civil
<br />Engineers, Orange County
<br />Branch / Los Angeles Section,
<br />Member
<br />American Water Works
<br />Association, Member
<br />Orange County Water
<br />Association, Member
<br />Additional Projects:
<br />e R-28 Reservoir and P-27
<br />Pumping Station
<br />P R-29 (2760 Zone) Reservoir
<br />and P-29 Pumping Station
<br />SNWA 340C-02 Hacienda
<br />Pumping Station
<br />Improvements
<br />C1244 Fries 2635 Zone
<br />Reservoir/2745 Zone
<br />Pumping Station
<br />x
<br />�N Y E A K I 1 X AI John Nagle, P.E.
<br />
|