Laserfiche WebLink
PROPOSAL <br />Civic Center Stnrmwcrterf iftStotPon Renovation C9est8n Services <br />Steven Slocum, P.L.S. <br />Survey <br />Mr. Slocum has years of progressive surveying experience. He <br />has worked on several significant projects, including; boundary <br />and street monumentation, topographic data collection, HDS <br />t Years of Experience: 16 <br />ground based Lidar (laser scanning) surveys, aerial control and <br />validation surveys, grading and utility construction staking, <br />EducationITraining: <br />A.A. Certificate of Surveying, <br />control, and settlement and deformation monitoring, Mr. Slocum <br />Santiago Canyon College <br />has worked as a Party Chief on projects including laser scan <br />P <br />surveys, pipeline alignment staking, settlement monitoring, and <br />j Licensos/certifications: <br />tunnel alignment verification, <br />Licensed Surveyor, California, .. <br />4 2013,9044 'A <br />Project Experience <br />` Certified Party Chief, California <br />I Transportation Worker <br />Baker Regional Water Treatment Plant, Lake Forest, <br />Identification Credential <br />California. Irvine Ranch Water District. Party Chief. <br />? (TWIC), California, 2011 <br />Responsible for field surveys. Michael Baker was the lead <br />CPR Certified, 2013 <br />consultant for the Baker Regional Water Treatment Plant <br />(BRWTP), For a number of years, water agencies in South <br />Professional Affiliations:¢ California Land surveyors <br />Orange County have investigated alternatives for improving <br />i Association, Orange County <br />both water supply and water system reliability. These agencies <br />Chapter, Past President <br />determined that a local treatment plant utilizing untreated <br />surface water from Metropolitan Water District as its source of <br />supply would be the preferred alternative. Michael Baker <br />provided preliminary and final design services for the BRWTP. <br />The planus sized for a capacity of 28 mgd and will utilize <br />p <br />miorofiltration as the primary method of treatment. Additional <br />j r. <br />project components Include raw water pump station; raw water <br />1 <br />pump station for Trabuco Canyon Water District; pretreatment, <br />including chlorine dioxide and coagulant; pressurized MIF <br />f' <br />membranes; UV disinfection; chloramination; backwash <br />recovery system; solids handling facilities; DYK reservoir <br />modifications; and product water pump station. <br />1 <br />FE08-14-R sunflower Pump Station Rehabilitation, <br />i <br />I <br />Fountain Valley, California. Abhe & Svoboda, Inc. Surveyor. <br />s <br />Michael Baker collected high-definition laser scanning, <br />terrestrial Light Detection and Ranging (LiDAR), data to <br />j <br />prepare three-dimensional modeling of a single auger and its <br />respective concrete cradle. The purpose of the scan was to <br />s <br />verify clearances between the auger and cradle to within one <br />± <br />half of an inch to one quarter of an inch. The scanning and <br />control survey was completed in four stages. <br />OC -44 Pipeline Rehabilitation/Replacement Project, <br />Orange County, California. Mesa Water District. Surveyor. <br />Responsible for topo surveying The OC -44 pipeline runs <br />approximately 8.6 miles through Orange County. Michael <br />Baker provided a comprehensive plan to investigate the <br />I x i 0 n n n 10 N n 1. Steven Slocum, P.L.S. <br />