My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MICHAEL BAKER, INC.
Clerk
>
Contracts / Agreements
>
M
>
MICHAEL BAKER, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2021 5:20:27 PM
Creation date
8/7/2018 12:56:56 PM
Metadata
Fields
Template:
Contracts
Company Name
MICHAEL BAKER, INC.
Contract #
A-2018-177
Agency
Public Works
Council Approval Date
7/17/2018
Expiration Date
7/17/2021
Insurance Exp Date
8/30/2021
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Civic Canter StormwoterLlff Stodon Renovotdon Design Services <br />Michael Baker has reviewed the City's proposed scope of work detailed in Attachment 1 of the <br />RFP. We intend to follow this scope as written; however, in the following paragraphs, we have <br />included some clarifications and assumptions used for budgeting purposes. We have also <br />provided value-added scope suggestions, for the City's consideration. <br />Task 1 — Pre Design <br />A. Project Kickoff & Site Visit. Michael Baker conducted an extensive site visit during the <br />preliminary study, and has reviewed the study to refamiliarize with the project. In general, <br />Michael Baker agrees with the proposed upgrades outlined In Alternative SA1 and F1 of <br />the preliminary study. During the detailed site visit, Michael Baker's team, consisting of <br />personnel involved with the preliminary study, as well as new members experienced in <br />pump station rehabilitation projects, will reevaluate the selected alternatives. <br />B. Value Engineering Summary. Following the detailed site visit, Michael Baker will analyze <br />the selected alternatives to identify value engineering opportunities. Potential value <br />engineering opportunities that have been identified during the proposal phase are included <br />in the Understanding of Need. These opportunities, as well as others, will be evaluated at <br />the time of the site visit. <br />C. Project Coordination. Michael Baker will provide project management and coordination, <br />and will prepare progress reports, schedules and invoices according to the City's <br />requirements. It is assumed progress reports, schedules and invoices will be provided or <br />updated monthly. Michael Baker will secure permits for site work during the Pre -Design <br />and Design phases, Construction phase permitting is excluded, as it is assumed this will <br />be the responsibility of the Contractor. It is assumed there will be three (3) Progress <br />Review Meetings (not including the preconstruction meeting, see Task M). <br />D. Records. Utilities. & Facilities Research. Michael Baker will research existing utility <br />information, record drawings, and field conditions as outlined in the RFP. During the <br />Preliminary Study, no record drawings of the Flower PS were available, and it is assumed <br />that Michael Baker will be responsible for field measurements of the existing pump station <br />to the extent required to produce the construction documents. <br />E. Environmental Clearance Document. Based on a review of the proposed improvements <br />and existing setting, it is anticipated that a CEQA Categorical Exemption will apply to each <br />lift station project. Michael Baker proposes to utilize the exemption under Section 15301, <br />Existing Facilities, which allows for the minor alteration of an existing public facility. As <br />such, Michael Baker will prepare a Notice of Exemption (NOE) as required under CEQA. <br />The NOE will cite the CEQA Guidelines, Section 15301, Existing Facilities. The NOE will <br />provide a brief project description, a description of the project site and affected area, <br />graphics to support the project description/location, and substantiation for the exemption. <br />IN INA NAY I ON At. 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.