Laserfiche WebLink
Electrical Lighting Design Services for Various Park Locations <br />RFP No. 18-031 <br />Audle Murphy -Ranch Sports Complex and Skate Park, Menifee, CA: Provided electrical <br />design fora 11 -acre park that features a lighted skate park, baseball and soccer fields, basketball <br />court, tot lot and playground. Also features two restroom buildings and security cameras <br />throughout the park site. <br />George Bellis Park, Bolsseranc Park and San Antonio Parks Sports Lighting Replacement, <br />Buena Park, CA: Provided electrical engineering design services for the upgrade of 43 existing <br />sports lighting poles with 188 new sports lights. In additional, added eight (8) new sports poles <br />with 40 new lights, added new automated lighting controls for all Ilghts and replaced three (3) <br />existing electrical services and switchgear across three park sites. <br />Menifee Town Center Central Park, Menifee, CA: Provided electrical design for 5 -acre park <br />with lighted parking lot, rest room building, multiple lighted picnic shelters with lockable electrical <br />outlets, splash pad water feature, landscape lighting, lighted walking paths, security cameras, <br />amphitheater with both 100 -amps and 200 -amp outdoor lockable event panels containing multiple <br />sized electrical outlets for live performances. <br />IDS' Project Team <br />Our Project Team consists of a Project Manager, a Principal -in -Charge and a Quality Assurance <br />Manager as well as team members for civil and cost estimating. IDS' Project Manager, Mr. <br />Michael Reed will be the primary point -of -contact for the City and has over 27 years of electrical <br />engineering experience in park/recreation, community center, municipal, street lighting, and <br />commercial projects. Michael can be reached at 949.387.8500 Ext. 328 or via emall <br />Michael.reed@idsgi.com. <br />Mr. Reed will be responsible for the technical adequacy and design. Additionally, he will ensure <br />the project stays on schedule and within budget by managing staffing hours and expenses, <br />comparing these expenditures with the proposed budget and approved work scope- project <br />engineers and architects will report directly to Michael. This chain -of -command allows IDS to <br />maximize effectiveness and efficiency and ensure that assignments are completed on time, within <br />budget, and are of defensible quality. <br />Our organizational chart shows the project team, including key and support staff, their project <br />roles and how all members will work through Mr. Reed to communicate with the City. Resumes <br />for Michael and other staff members are included within this section. <br />As Project Manager, Mr. Reed will establish project responsibilities, organizational structure and <br />clear lines of reporting within the consulting team. Based on our experience in similar projects, <br />we have developed a clear and efficient management procedure for our services. Michael will: <br />• Develop the project schedule and monitor the progress of the project through standing team <br />meetings, and monitor the review budget at various stages. Provide progress reports and <br />facilitate the review of the work. <br />Monitor the technical performance of the project team, ensure quality and consistency (QC), <br />and ensure detection and resolution of project performance issues before they become <br />problems. <br />AA IDS GROUP <br />25B-19 <br />Page 6 <br />