My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT CITY PARK UPGRADES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
08/21/2018
>
25B - AGMT CITY PARK UPGRADES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2018 11:16:30 AM
Creation date
8/16/2018 11:12:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
8/21/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electrical Lighting Design Services for Various Park Locations <br />RFP No. 18-031 <br />• Ensure that the City is clearly informed of the progress and status of the project. <br />• Enhance working relationships of team members and the City. <br />Subconsultants <br />All services can be performed in-house; therefore, IDS does not anticipated utilizing any <br />subconsultants for this contract. <br />Key Personnel Resumes <br />Full resumes of key personnel proposed to work on this project are provided Attachment A of this <br />proposal. <br />Staff Availability <br />The following is an estimate of the availability of our key personnel during the duration of this <br />project. The percentages of key staff availability shown are projected based on anticipated <br />workload. These percentages represent the average time available for a team member. Actual <br />time may vary depending on the project specifics. <br />Robin (Rob) O'Neil, PE <br />45% <br />Hassan (Hank) M. Bagheri, PhD, PE, LEED AP 30% <br />Michael Reed <br />Peter Gambino, PE, PLS, QSD <br />40% <br />45% <br />AAIDS GROUP Page 7 <br />25B-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.