My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT CITY PARK UPGRADES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
08/21/2018
>
25B - AGMT CITY PARK UPGRADES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2018 11:16:30 AM
Creation date
8/16/2018 11:12:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
8/21/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electrical Lighting Design Services for Various Park Locations <br />RFP No. 18-031 <br />e. Relevant Project Experience <br />IDS and ourteam of professional engineers provide value added multidisciplinary, 'one -stop -shop' <br />design and consulting services for recreational I park facilities. Our project team brings an <br />established track record of providing engineering and architectural design services for various <br />recreation projects including: <br />Design Services for Town Square Park Phase 1, 2, and 3 <br />Murrieta, CA <br />IDS provided design services to complete the improvements for <br />the construction of three prefabricated buildings (storage, <br />performers changing rooms, and restrooms) along with utility <br />service connections to Town Square Park. The goal of the <br />project was to provide the City with a comprehensive set of plans <br />and specifications to facilitate the construction. This included: <br />• Utility research and locating within the project area and <br />identifying potential conflicts <br />• Coordinating the relocation and service connections with <br />utility purveyors <br />• Preparing plans and specifications for stage lighting, sound <br />systems, and technology <br />• Preparing site utility plans to establish service connections <br />for the prefabricated buildings <br />• Preparing electrical engineering lighting plans and <br />specifications for lights around the park <br />• Conducting quantity take offs and preparing cost estimates <br />• Prepare exhibits and attend meetings to support the <br />community outreach effort <br />AA, IDS GROUP <br />25B-23 <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.