My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT CITY PARK UPGRADES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
08/21/2018
>
25B - AGMT CITY PARK UPGRADES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2018 11:16:30 AM
Creation date
8/16/2018 11:12:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
8/21/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electrical Lighting Design Services for Various Park Locations <br />RFP No. 18-031 <br />City of Irvine San Diego Creek Bike Trail Lighting Improvements: San Diego Creek to <br />Culver, CIP 341302, Spectrum to 1.405 CIP 34150,11-405 to Culver CIP 322920, and Peters <br />Canyon CIP 341303 <br />Irvine, CA <br />The City of Irvine has contracted with IDS on multiple <br />occasions to provide engineering design services for <br />various pedestrian trail projects that meander throughout <br />the city. IDS was the preferred consultant for these projects <br />since they required close coordination between disciplines <br />that only a multi -disciplined firm can provide. <br />IDS designed and prepared electrical plans for the trail <br />lighting as envisioned by the City. The plan shows the <br />proposed fixtures, photometric lighting study, fixture counts <br />and cut sheets, meter, pedestal, and distribution circuitry. In <br />preparing these plans, IDS conducted calculations of <br />electrical loads, load shedding, short circuit calculations, <br />voltage drop and the structural design of light fixture <br />foundation. In addition, IDS prepared a demolition plan <br />showing the removals of the items that are in conflict with <br />the proposed lighting, hardscape, and irrigation <br />improvements such as hardscape, landscape, trees, <br />conduit, and piping. <br />IDS coordinated with the utility companies which maintain <br />facilities in the affected area and develop a utility relocation <br />plan for the utilities impacted by this project, The plans and <br />specifications under this task identified the time frames to <br />complete the utility work. <br />AAIDS GROUP Page 11 <br />25B-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.