Laserfiche WebLink
Local Assistance Procedures Manual EXHIBIT 10-H1 <br />Cost Proposal <br />EXHD3TT 10-H1 COST PROPOSAL Page of <br />A(.-rrtAT. CngT-PT.;oy FTXRn FRF.ORLj2x SriM(FIRm FIXED PRICE) CONTRACTS <br />(CALCULATIONS FOR ANTICIPATED SALARY INCREASES) <br />1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) <br />4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) <br />Direct Labor <br />Total Hours per <br />Avg 5Year <br />Subtotal per Cost <br />Cost Proposal <br />Hourly Contract <br />$55.42 * 180.5 <br />Proposal <br />Estimated Hours Year 1 <br />Year 2 <br />Rate Duration <br />_ $- <br />$10,004.50 <br />180.5 <br />= <br />$55.42 Year 1 Avg <br />Estimated Hours Year 3 <br />Year 4 <br />$58.81 * - <br />_ $- <br />Hourly Rate <br />2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %) <br />$59.98 * - <br />Avg Hourly Rate <br />Proposed Escalation <br />Total Direct Labor Cost with Escalation <br />Year 1 <br />$55.42 <br />+ 2% <br />_ $56.52 <br />Year 2 Avg Hourly Rate <br />Year 2 <br />$56.52 <br />+ 2% <br />_ $57.65 <br />Year 3 Avg Hourly Rate <br />Year 3 <br />$57.65 <br />+ 2% <br />_ $58.81 <br />Year 4 Avg Hourly Rate <br />Year 4 <br />$58.81 <br />+ 2e/a <br />= $59.98 <br />Year 5 Avg Hourly Rate <br />3. Calculate <br />estimated hours per year (Multiply estimate% each <br />year by total hours) <br />Estimated %Completed <br />Total Hours per Cost <br />Total Hours <br />per <br />Each Year <br />Proposal <br />Year <br />Year 1 <br />20.0% <br />* 5000 <br />= 1000 <br />Estimated Hours Year 1 <br />Year2 <br />40.0% <br />* 5000 <br />= 2000 <br />Estimated Hours Year 2 <br />Year 3 <br />15,0% <br />* 5000 <br />= 750 <br />Estimated Hours Year 3 <br />Year <br />15.0% <br />* 5000 <br />= 750 <br />Estimated Hours Year4 <br />Year 5 <br />10.0% <br />* 5000 <br />= 500 <br />Estimated Hours Year 5 <br />Total <br />100% <br />Total <br />= 5000 <br />4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) <br />NOTES: <br />1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # <br />of years of the contract, and a breakdown of the labor to be performed each year. <br />2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. <br />(i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology) <br />3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. <br />4. Calculations for anticipated salary escalation must be provided, <br />Gensler I Santa Ana Regional Transportation Bike Station <br />25N-79 <br />Avg Hourly Rate Estimatedhours <br />Cost per <br />(calculated above) (calculated above) <br />Year <br />Year 1 <br />$55.42 * 180.5 <br />= $10,004.50 <br />Estimated Hours Year 1 <br />Year 2 <br />$56.52 * - <br />_ $- <br />Estimated Hours Year 2 <br />Year 3 <br />$57.65 * - <br />_ $- <br />Estimated Hours Year 3 <br />Year 4 <br />$58.81 * - <br />_ $- <br />Estimated Hours Year 4 <br />Year 5 <br />$59.98 * - <br />_ $- <br />Estimated Hous Year 5 <br />Total Direct Labor Cost with Escalation <br />= $- <br />Direct Labor Subtotal before Escalation = <br />$- <br />Estimated total of Direct Labor Salary <br />= <br />Transfer to Page 1 <br />Increase <br />$10,004.50 <br />NOTES: <br />1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # <br />of years of the contract, and a breakdown of the labor to be performed each year. <br />2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. <br />(i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology) <br />3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. <br />4. Calculations for anticipated salary escalation must be provided, <br />Gensler I Santa Ana Regional Transportation Bike Station <br />25N-79 <br />