My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25N - AGMT BIKE STATION DESIGN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
08/21/2018
>
25N - AGMT BIKE STATION DESIGN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2018 11:17:47 AM
Creation date
8/16/2018 11:13:17 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25N
Date
8/21/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual EXHIBIT 10-H1 <br />Cost Proposal <br />FxHIBTr 10-H1 COST PROPOSAL Page3 of <br />Certification of Direct Costs: <br />I, the undersigned, certify to the best of my lmowledge and belief that all direct costs identified on the cost <br />proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the <br />contract terms and the following requirements: <br />1. Generally Accepted Accounting Principles (GAAP) <br />2, Terms and conditions of the contract <br />3. Title 23 United States Code Section 112 - Letting of Contracts <br />4. 48 Code of Federal Reaulations Part 31 - Contract Cost Principles and Procedures <br />5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of <br />Engineering and Design Related Service <br />6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) <br />All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be <br />retained in the project files and be in compliance with applicable federal and state requirements. Costs that are <br />noncompliant with the federal and state requirements are not eligible for reimbursement. <br />Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect <br />Cost Rate(s). <br />Prime Consultant nr Subconsultant Certifying: <br />Name: Kunal Shah, P.E. Title *: President/CEO <br />Signature : Date of Certification (mm/dd/yyyy):X/21!2018 <br />Email: kshahOPbsengineers.com Phone Number: 626-650-0350 <br />Address: 2100 E. Route 66, Suite 101, Glendora, CA 91740 <br />*An individual executive or financial officer of the consultant's or subconsultant's organization at a level <br />no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent <br />the financial information utilized to establish the cost proposal for the contract. <br />List services the consultant is providing under the proposed contract: <br />Mechanical, Electrical and Plumbing Engineering Design Services <br />Gensler I Santa Ana Regional Transportation Bike Station <br />25N-80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.