My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19D - AMBULANCE RFP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
08/21/2018
>
19D - AMBULANCE RFP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2018 6:30:12 PM
Creation date
8/16/2018 6:27:23 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
19D
Date
8/21/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 City of Santa Ana <br />than sixty (60) days from the development of the CAP, the CAP shall <br />specify interim dates by which specific steps toward correction of <br />the service or performance deficiency, or substantial inadequacy, <br />will take place with the total time period not to exceed three (3) <br />months. <br />iii. CAP Inspection/Compliance <br />The Fire Chief or his designee, shall visit and inspect Contractor's <br />business office, facilities, vehicles, personnel, and/or records to <br />review and document actions taken by Contractor to implement the <br />CAP and shall document any continuing service or performance <br />deficiency, or substantial inadequacy, which is not,corrected within <br />the specified time frame. In the event Contractor fails'to correct the <br />service or performance deficiency, or substantial inadequacy <br />identified in the CAP within the time frame provided, OCFA may find <br />Contractor to be in material breach of the Agreement. <br />D.Timely Performance Required <br />Assessment of penalties or the imposition of a CAP, pursuant to this Section <br />will not relieve Contractor of the responsibility to meet all performance <br />expectations as set •forth in the Contract Documents. Substandard <br />cumulative response time performance (i.e., below the 90% compliance <br />rate for combined Code 2 and Code 3 calls) in any two (2) quarters in a <br />single twelve (12) month period will constitute breach of contract, resulting <br />in the imposition of a Remedial Action Plan (RAP). <br />Failure to timely correct and cure any response time deficiency, after having <br />been given notice and a reasonable opportunity to cure such violation in <br />accordance with an established Corrective Action Plan (CAP) or failure to <br />cure a breach of contract after the imposition of a Remedial Action Plan <br />(RAP), may constitute a material breach of the Agreement. Additionally, <br />City of Santa Ana Page 147 <br />Fire/EMS Emergency Ambulance Transportation and Related Services <br />Request for Proposals: # 18-059 <br />August 28, 2018 <br />19D-57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.