My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT HAZARDOUS MATERIALS SURVEYS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
08/21/2018
>
25F - AGMT HAZARDOUS MATERIALS SURVEYS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2018 7:29:46 PM
Creation date
8/16/2018 7:20:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25F
Date
8/21/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP No. 1M43 <br />5 - Prepare Reports • City of SantaAna <br />Al - Environmental Site Assessment <br />PROJECT UNDERSTANDING AND TECHNICAL APPROACH <br />Ninyo & Moore will perform the following tasks to successfully meet the objectives: <br />Task 1 - Project Coordination <br />Ninyo & Moore will work closely with the City's project manager regarding project schedule, coordination <br />with site contacts and subcontractors, budget tracking, preparation and submittal of invoices, and <br />compliance with the scope of work. The project manager will track and optimize project scope and <br />schedule on a weekly basis using internal Ninyo and Moore tools, and will receive updates from <br />personnel involved with the project. An important aspect of successful performance is the Implementation <br />of an initial meeting with the project team to strengthen collective understanding of the project objectives. <br />Thus, prior to field implementation, Ninyo & Moore will conduct a project kick-off meeting with the City <br />and an in-house kick-off meeting with staff to discuss health and safety at the site, pre -field planning, <br />scope of work, project objectives and assumptions, and project schedule. After authorization from the <br />City, Ninyo & Moore will meet with the RWQCB to ensure their requirements for site assessment are met, <br />Task 2 - Phase I ESA <br />Ninyo & Moore will perform a Phase I ESA as follows: <br />• Conduct the Phase I ESA in a manner consistent with the ASTM 2013 guidance (Designation <br />Number E1527-13) and the EPAAII Appropriate Inquiry rule. The objective of this assessment was to <br />evaluate whether past or current activities resulted in RECs as defined in ASTM E1527-13. <br />• Review and document the environmental history of the site including: review of utility plans showing <br />historical equipment(structure locations; historical aerial photographs to assess past and present <br />uses of the site and adjacent properties; facility reports including business contingency plans, spill <br />prevention, control and countermeasures plans (SPCCs), SWPPPs; clarifier and hoist records: and <br />site assessment and clean-up reports (including the UST removal documentation). <br />• Review regulatory agency databases including those available on EnviroStor, GeoTracker, and on- <br />line databases. <br />• Interview parties familiar with the site environmental history and historical operations and performed <br />a site walk with personnel knowledgeable about the site operations and history. <br />• Prepare a summary of this historical research and include preliminary scoping for Task 3 - Phase II <br />ESA. <br />Task 3 - Phase II ESA <br />Ninyo & Moore will perform a Phase II ESA as follows: <br />To Investigate the ADCs/RECs identified in the Phase I ESA we will advance 12 exploratory borings. The <br />goal is to evaluate the presence of contamination on site among multiple media (soil, soil vapor, and <br />groundwater), waste types, and chemical characteristics; and to evaluate the inhalation risk from existing <br />site contaminants to future occupants. The laboratory analytical and survey data will be uploaded to the <br />SWRCB GeoTracker database along with the final Phase II ESA report to comply with RWQCB <br />requirements. To complete the Phase II ESA, the following tasks will be performed: <br />® Ninyo & Moore I City of Santa Ana - (All Environmenta2l ,hgsp_sja l 05-00713 1 June 5, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.