My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
50A - ORD TELECOMMUNICATIONS FAC
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
08/21/2018
>
50A - ORD TELECOMMUNICATIONS FAC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2018 7:22:50 PM
Creation date
8/16/2018 7:21:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
50A
Date
8/21/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. A radius map indicating: <br />A. For Tier 2 facilities, one -hundred and fifty (150) feet of the <br />exterior boundaries of the proposed installation site. <br />B. For Tier 3 facilities, three -hundred (300) feet of the exterior <br />boundaries of the proposed installation site. <br />(b) For purposes of the notice requirements below, the City will provide to <br />the Applicant a list of names and addresses of all property owners within <br />five (5) business days, as shown on the latest assessment roll of the <br />county assessor. <br />1. For applications for Tier 2 facilities (as defined by the Guidelines), <br />the applicant shall provide notice by: <br />A. Mailing notices to property owners located in residential <br />zones and within one -hundred and fifty (150) feet of the <br />exterior boundaries of the proposed installation site. <br />B. Mailing notices to any neighborhood association <br />representing residential property located within one - <br />hundred and fifty (150) feet of the exterior boundaries of <br />the proposed installation site. <br />C. Posting a copy of the notice at the proposed installation <br />site on the existing utility pole, street light or similar <br />structure to be modified or replaced, or as close thereto <br />as reasonably possible. <br />2. For applications, for Tier 3 facilities (as defined by the Guidelines), <br />the same notice requirements shall apply, except that notice shall <br />be delivered to the persons listed above within a three -hundred <br />(300) foot radius of the proposed site. <br />(c) Written comments from members of the public received by the <br />Director shall be --considered as part of the staff -review. Comments <br />shall be accepted for twenty (20) days following the date the notice is <br />provided. <br />(d) The applicant shall work cooperatively with the City to consider or <br />otherwise respond to comments received by the Director. <br />Sec. 33-240. Permit Issuance. <br />(a) A permit for a wireless facility shall be granted, denied, or conditionally <br />granted by the Director. In the event that an application is deemed <br />granted by rule of law, all conditions and design guidelines as <br />required by this ordinance for the facility are still applicable and <br />required for the facility. <br />Ordinance No. NS -XXX <br />Page 11 of 21 <br />5OA-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.