Laserfiche WebLink
(b) For an eligible facilities request, the Director shall issue a permit if the <br />Director finds that the proposed facility qualifies as an eligible facilities <br />request and does not represent a substantial change. <br />(c) For any facility other than an eligible facilities request, the Director <br />shall issue a permit if the Director makes all of the following findings: <br />1. The proposed facility conforms to the Guidelines, including any <br />volumetric limits, design criterion, and location restrictions detailed <br />therein. <br />2. The proposed wireless facility is visually compatible with the <br />surrounding neighborhoods. <br />3. The applicant has demonstrated that the installation will not <br />substantially interfere with the use of the public right-of-way and <br />existing subterranean infrastructure, including interference with <br />the flow of pedestrian or vehicular traffic, the ingress or egress <br />from any residence or place of business, the use of poles, <br />posts, traffic signs or signals, hydrants, mailboxes, permitted <br />sidewalk dining, permitted street furniture or other objects <br />permitted at or near the proposed site of the wireless facility. <br />4. The applicant has demonstrated that the wireless facility will <br />not endanger or is not reasonably likely to endanger the safety of <br />persons or property. <br />5. The proposed wireless facility complies with all applicable <br />regulations of the FCC. <br />6. The applicant has coordinated the final siting location of the <br />facility with the Director. <br />7. The applicant has posted a performance bond or other security <br />In an amount rationally related to the cost of removal. <br />8. All notification requirements for the prof osed facility have <br />been met. <br />(d) In granting or denying an application, the Director shall make a <br />written finding which shall specify all facts relied upon in rendering his <br />decision. A copy of the decision shall be filed with the Public Works <br />Agency and mailed to the applicant and to any person who has <br />submitted a comment on the proposed application pursuant to <br />Section 33-239. <br />(e) Permits are issued fora period of ten (10) years from the date issued. <br />Sec. 33-241. - Renewal. <br />To extend a wireless facility permit for an additional five (5) year period, the <br />applicant shall provide proof that it continues to have the legal authority to occupy and <br />use the PROW for the purpose set forth in its permit, that its site as it exists at the time <br />Ordinance No. NS -XXX <br />Page 12 of 21 <br />50A-16 <br />