Laserfiche WebLink
q) Contractor will be compensated for work performed and fixtures installed prior to <br />December 2151, 2018 deadline. Additionally, any increase on the Base Price due to larger <br />inventory will require written approval by the Agency and will follow procedures set <br />forth for change orders. Any decrease on Base Price due to smaller inventory will result <br />in a lower Base Price to the Contractor. <br />r) The Contractor shall conduct all work between in the time window established after the contract <br />is awarded. <br />s) The Contractor shall comply with safety requirements and practices as outlined in accordance <br />with Agency requirements and California Occupational Health and Safety Administration <br />(Cal/OSHA). <br />t) The Contractor shall do all that is necessary to maintain a safe working environment for <br />Contractor's employees, Agency and facility employees and the general public present. <br />u) The Contractor shall work with the Agency facility staff to understand and abide by any site- <br />specific security procedures. <br />v) The Contractor shall clean up any construction dust, dirt and debris from work surfaces or <br />equipment after work is completed each day and prior to occupancy. <br />w) The Contractor shall be very careful to leave the facility with no damage to its structure, contents, <br />existing finishes, and with no evidence of cutting or patching, and with all fixtures and lenses <br />cleaned. <br />x) The Contractor is responsible for securing all necessary permits, including Title 24 energy code <br />documentation and compliance permit, and shall abide by local laws and regulations. <br />y) Prior to ordering of equipment and fixtures, Contractor is to verify fixture quantities, types and <br />installation needs, including specifying equipment that complies with existing electrical <br />service. Final project invoice price will be based upon the quantity of each fixture type installed <br />multiplied by the unit price for that fixture. <br />25B-36 <br />