My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/04/2018
>
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 7:43:13 PM
Creation date
8/30/2018 7:26:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
9/4/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Key Personnel <br />One of the primary advantages to selecting Interest to provide these services Is the depth and <br />breadth of our professional resources. The staff members listed in this proposal are a <br />representative sample from our larger pool of local public works staff. This extensive pool of <br />local resources provides Interest with both flexibility and the ability to scale our services as <br />needed to meet any cyclical demands the City may have. <br />Individually, the professionals showcased below excel In each of their backgrounds. As a team, <br />they possess the capability to innovatively create and implement effective solutions with your <br />agency and the community's Interests in mind. <br />Percentage of availability for individual staff members will be determined based on the timing <br />and scale of specific projects as assigned. The Project Manager and supporting associates can <br />be up to 100% available to the City, also subject to the timing and scale of the project. We are <br />dedicated to providing the City of Santa Ana with adequate staffing throughout an assigned <br />project's life to ensure timely and accurate services that meet or exceed the City's expectations. <br />Terry Rodrig ue, PE, TE PRINCIPAL -IN -CHARGE <br />George Alvarez, PE, TE PROJECT MANAGER <br />ENGINEERING PLAN REVIEW I PROJECT MANAGEMENT <br />Ludy Smeets, PE <br />Kamran Saber, PE, QSD <br />Erik Updyke, PE <br />Sudl Shoja, PE <br />Gary Miller, PE <br />Mike Loving <br />Thom Coughran, PE <br />Gary Neal, PLS <br />Kevin Ko, PE, QSD <br />TRAFFIC SERVICES <br />Nicole Jules, PE <br />Ruth Smith, TE, PTP <br />Andrew Yl, PE, TE, PTOE <br />Grecia Bahena <br />Yvonne Soto <br />PLAN REVIEW ENGINEER I PROJECT MANAGER <br />PLAN REVIEW ENGINEER I PROJECT MANAGER <br />PLAN REVIEW ENGINEER I PROJECT MANAGER <br />PLAN REVIEW ENGINEER I PROJECT MANAGER <br />PLAN REVIEW ENGINEER I PROJECT MANAGER <br />STORM WATER QUALITY COORDINATOR <br />WATER QUALITY & UTILITIES ENGINEER <br />MAP CHECKER <br />SENIOR ENGINEER <br />TRAFFIC ENGINEER <br />TRAFFIC ENGINEER <br />TRAFFIC ENGINEER <br />ASSOCIATE ENGINEER I TRAFFIC SUPPORT <br />ASSOCIATE ENGINEER I TRAFFIC SUPPORT <br />CONSTRUCTION OVERSIGHTAND INSPECTION SERVICES <br />Al Cablay, PWLF <br />CONSTRUCTION MANAGER <br />Ludy Smeets, PE <br />CONSTRUCTION MANAGER <br />Hamid Abedzadeh, PE, QSD <br />CONSTRUCTION MANAGER & INSPECTOR <br />Ciros Ganji <br />CONSTRUCTION MANAGER & INSPECTOR <br />Chuck Stagner <br />CONSTRUCTION INSPECTOR <br />Julio Velasco <br />CONSTRUCTION INSPECTOR <br />INTERWEST <br />CONSULTING GROUP <br />25F-58 <br />Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.