My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/04/2018
>
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 7:43:13 PM
Creation date
8/30/2018 7:26:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
9/4/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 2 <br />Scope of Services & Schedule <br />In the sections following, we have provided typical scopes of work for the main areas of the RFP <br />we propose to provide services in: <br />o Engineering Plan Review <br />o Project Management <br />o Engineering & Administrative Support of the City's Neighborhood Traffic Management <br />& Residential Permit Parking Program <br />o Construction Management, Project Inspection, & Oversight <br />Interwest does not propose to provide design, survey, or accounting services for this contract. <br />We are however fully capable of providing the Building Inspection and GIS Analyst services <br />implied in the list of potentially required personnel, but omitted from the scope of work. We have <br />Included hourly rates for these positions in the fee schedule, and would be happy to provide a <br />scope of work and a list of qualified candidates for these potions upon request. <br />Schedule <br />We will supply the City with a list of candidates to fill a particular position within 48 hours of the <br />City alerting us of a need. <br />Engineering Plan Review <br />Our team of plan review engineers is committed to meeting the needs of our clients. We work <br />with you to efficiently review and approve plans and maintain schedules. We guarantee the <br />highest level of quality through the plan check cycle, from planning and design to construction <br />completion. Areas of focus include: <br />• Street improvement, rehabilitation, and widening plans <br />• Water, sewer, utilities, and water Infrastructure plans <br />• Mechanical and Electrical plans <br />• Traffic and road striping plans <br />• Map Checking <br />Related tasks also Include: <br />• Preparation of Conditions of Approval <br />• Conducting research on the project <br />• Attending Planning Commission meetings <br />• Preparing the scope of work and reviewing traffic impact analysis <br />• Reviewing and commenting on EIR's for private development <br />• Calculating impact fees <br />• . Meeting with City staff to coordinate conditions of development <br />• Meeting with private engineers and developers regarding public works matters <br />INTERWEST Page 113 <br />CONSULTING GROUP <br />25F-67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.