My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/04/2018
>
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 7:43:13 PM
Creation date
8/30/2018 7:26:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
9/4/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
During construction, we will provide supplemental support to the City and construction <br />management section for construction inquiries. This supplemental construction support <br />includes: <br />o Reviewing and preparing responses to RFI's <br />o Reviewing Contractor submittals and shop drawings for compatibility with design <br />o Reviewing and providing recommendations of change order proposals <br />o Performing final review/evaluation & assisting with the preparation of punch list for <br />work deficiencies <br />o Preparing record drawings of the completed projects based upon the redlined set of <br />as -built plans <br />Construction Phase <br />Project Schedule I Submittal Review: A realistic schedule that meets the requirements of the <br />contract documents is critical to the success of the project. Our team will constantly monitor the <br />schedule, noting and making the City aware of any critical path slips, as well as any <br />opportunities to compress the schedule that may arise. Further, timely and thorough submittal <br />review is critical to a project. Examples of activities include: <br />• Coordinate, review & approve the Contractor's proposed schedule for completion of <br />project. <br />• Review contractor's schedule, update submittals for conformance to master schedule and <br />contract documents. <br />Document Control: We use the proven method of controlling documents through the system <br />developed and used by Caltrans. We will apply consistent procedures to track all <br />documentation, regardless of project size and location. Doing so will result in a standard <br />documentation and filing system across the board for capital projects. As a result, records <br />retrieval will be quick and efficient. Work activities Include: <br />• Maintain all project documents, drawings, contract change orders, contractor submittals, <br />shop drawing and correspondence in electronic form and hard copy. <br />• Maintain at the project site an up-to-date copy of all contracts, drawings, specifications, <br />addenda, change orders & other modifications, in good order & marked to record all <br />changes made during construction. We track documents, including all correspondence. <br />• Ensure an office engineer is available for projects with significant document control needs, <br />and all files will be set up by our office engineer, regardless of size. <br />• Maintain a digital photographic library & significant activities. <br />• Maintain RFI, submittal and change order logs. Ensure consultants and engineers respond <br />within contract time frames. We track the number of days submittals are outstanding and <br />with a particular party on a weekly basis and report this information to the appropriate <br />staff. <br />• Monitor Contractor and the sub -contractors regarding compliance with prevailing wage <br />rates and affirmative action requirements applicable to the project including a Labor <br />Compliance Program in accordance with AB 1506 and the Davis -Bacon Act. Our <br />Inspectors and office engineers are trained on the appropriate forms and techniques <br />necessary to conduct these compliance activities. <br />• Collect and review, for compliance with all State and Federal regulations, certified payroll <br />records requirements. <br />Weekly I Monthly Construction Meetings: We would attend and chair weekly or monthly <br />project meetings with the contractors and stakeholders. We can prepare the agenda and <br />IfINTERWEST Page 116 <br />CONSULTING GROUP <br />25F-70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.