My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/04/2018
>
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 7:43:13 PM
Creation date
8/30/2018 7:26:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
9/4/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
discuss schedule, budget, changes, safety issues, etc. This has proven to be an important step <br />to getting the project on schedule early. <br />Change Order Review/Dispute Resolution: Our team will review any requests for contract <br />change orders to verify the work is necessary and outside of the contract, and we will negotiate <br />the best way from the City perspective to pay for the work, whether that is time and materials, <br />unit prices, or a negotiated amount. We will advise City as to their effect on the contract time <br />and cost. We can perform Independent estimates of proposed change order work when <br />necessary or when directed by the City. The Construction Manager will then make a <br />recommendation for approval, which according to the City policy, will ultimately need approval <br />by the Public Works Director. <br />Materials Testing Management: We will coordinate and schedule the materials testing <br />services to acquire the necessary services, and reports, in the most efficient manner. <br />Compaction Control: We will coordinate compaction testing with the soil engineering firm to <br />verify all compaction conducted meets all requirements and specifications. <br />Progress Payment Processing: We will review progress payments and verify quantities/unit <br />prices, amount due, certified payroll, appropriate rates, etc. If the review shows the progress <br />payment is accurate, we will then recommend payment and circulate It to Project Manager for <br />additional review, signature and approval. <br />Agency Coordination: We will coordinate any work with other agencies to maximize contractor <br />efficiency and keep the project on schedule. <br />Project Close -Out Phase <br />Punch List Completion: Our Inspector will generate and make the contractor aware of <br />deficiencies as they occur in the Feld. We will encourage the contractor to repair or replace work <br />that does not meet the specifications when it is identified. Interwest will oversee the complete <br />performance of all punch list items and final clean-up before contractor moves off-site. Each <br />punch list item is personally signed off by a member of our team, and all items must be signed <br />off before the construction manager signs the list as complete. <br />Record Drawings and Other Documents: Our Construction Manager will review the record <br />drawings with the Inspector for accuracy & completeness prior to acceptance of the project. <br />This is monitored weekly. At the end of the project, we will obtain from contractor all record (as - <br />built) drawings: O&M materials, attic stock, contract required documents, lien releases, & written <br />warrantees. <br />Geotechnical Report: Our Construction Manager will obtain a complete geotechnical report <br />with all test results, logs, and correspondence from the geotech prior to releasing their final <br />payment. <br />Final Report: Our team will prepare a final report for the project that recaps the costs, schedule, <br />successes, and lessons learned to the City and the Project Manager for use in preparing the <br />City Council Notice of Acceptance Staff Report. <br />An inventory of the "wrap up" tasks for construction management activities Include: <br />• Administer post -construction training of custodial, maintenance, operations and grounds <br />staff for all new equipment, systems and finish materials. We intend to invite the <br />appropriate City maintenance personnel to the final walk-through of the project so they <br />may ask questions and review the work. We understand that the project is built for the <br />end-user, which Is usually the maintenance department on behalf of the citizens. <br />INTERWEST Page 117 <br />CONSULTING GROUP <br />25F-71 <br />