My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/04/2018
>
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 7:43:13 PM
Creation date
8/30/2018 7:26:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
9/4/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST <br />CONSULTING <br />GROUP <br />ww w. in to rwe otarp, a am <br />• Lawndale Various Streets and Allays Design Improvements I City of Lawndale <br />Princlpal-in-Charge 1 2012 1 Design services Include: roadway and drainage <br />Improvements and the development of an alternative pavement method to <br />address wet subgrade and modifications to design and bid package to <br />accommodate budgetary changes. <br />• John Wayne Perimeter Road Improvements, John Wayne Airport (SNA) I John <br />Wayne Airport I Principal -In -Charge 12010 — 2015 Provided oversight of design <br />services for Phase I & II on the reconstruction of 4,000 linear feet of roadway. <br />• 190'hStreet Rehabilitation I City of Torrance I Principal -in -Charge 12009 <br />• Carnegie Library Streetscape Improvements / Carnegie Library landscape <br />Improvements I Anaheim Redevelopment Agency I Project Manager 12006 <br />• Rockfield Boulevard Streetscape Master Plan I City of Lake Forest I Principal -In - <br />Charge 1 2007 — 2009 1 Provided a street-scape master plan and final <br />construction PS&E. The development of the plan required extensive community <br />workshop in order to identify city goals and design criteria including decorative <br />paving and a cohesive landscape character. Gary oversaw a team of urban <br />designers, landscape architects, civil and traffic engineers, and construction <br />management and inspection services forthe streetscape Improvements. <br />• Apple Valley Road Realignment and Widening j Town of Apple Valley I Principal - <br />in -Charge 12005 1 Roadway design for the widening of 2.7 miles of Apple Valley <br />Road from Yucca Loma Road to Bear Valley Road. <br />• North Long Beach Street Enhancement Program I City of Long Beach I Principal - <br />In -Charge 1 2005 1 Provided program management and oversight and <br />engineering coordination for Improvements within the public rights-of-way In the <br />North Long Beach Redevelopment Project Area. <br />• Oceanside Boulevard at Rancho del Oro Drive I Stirling Enterprises, LLC I Project <br />Manager 1 2006 1 Managed construction management, preliminary and final <br />design, PS&E, analysis review, design surveys, topographic mapping and utility <br />investigations. <br />ADDITIONAL WORK EXPERIENCE <br />Project Engineer <br />1981-1983 <br />Project Designer I Project Engineer <br />1979-1981 <br />Project Designer <br />1978-1981 <br />25F-96 <br />Gilbert Engineering <br />City of Newport Beach <br />City of Downey <br />Page 142 <br />
The URL can be used to link to this page
Your browser does not support the video tag.