My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT WATER ENGINEERING CONSULTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/18/2018
>
25E - AGMT WATER ENGINEERING CONSULTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 5:01:52 PM
Creation date
9/13/2018 4:56:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
9/18/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF QUALIFICATIONS <br />TABLE 1. KEY TEAM MEMBERS QUALIFICATIONS <br />Tim Mull, PE, LEED AP <br />Lead Engineer <br />1B Yearsof Experience <br />MS, BS Civ Engineeringng <br />40%. Time Commitment <br />Neil Harper, PE <br />Pump Vault Design <br />19 Years of Experience <br />BS CIO Engineering <br />20% Time Commitment <br />• Lead Engineer for Lennar Home, The Lake Pond Design <br />• Project Engineer for Western Municipal Water District, Victoria Basin Recharge Pond Design <br />• Project Engineer for Fivepoint Communities Heritage Fields Drainage, Water Quality, Trails, and Lake <br />Features <br />• Vaull/Pump Analysis City of Santa Ana Centennial Park lake Rehabilitation Project Manual <br />• Pump Station Design for Eastern MWD North Tmmble Road Recycled Water Ponds and Pumps <br />• Pump Station Design for Santa Maria WWTP Percolation Pond Pumps <br />• Project Manager for Temescal Valley WD Pond Design acid Pump Stations <br />Greg Glen, PhD, PE <br />TreatmentDesign <br />• Project Manager for City of Santa Ana Centennial Park Lake Rehabllilation Project Manual <br />Jonis Smith, PE, CFM <br />• Lead Engineer with J. Harlan Glenn, a Dudek subsidiary, designing Harveston Lake -Temecula, Lake <br />Project Manager <br />#9 Trump International Golf Course, Heritage Park Lake -Cerritos, Black Gold Golf Course Lake - <br />23 Years of Experience <br />Yorba Linda, and Rancho Sahuadla Lake- Rancho Sahuadta, AZ <br />MS, BS Civil Engineering <br />• Project Manager for Santa Maria W WTP Percolation Pond <br />50°%Time Commitment <br />• Project Manager for Ramona MWD Pond Rehab <br />_ _ _______ _ _ __ _ __ _ _ <br />J <br />__• Project Manager for Marin Country Club Lake Rehab _ <br />Ohl <br />Bob Principal In , PE <br />Charge <br />• Project Manager for Sarda Maria W WTP Percolation Pond <br />32 Years of Experience <br />® <br />• Project Manager for Eastern MWD North Tmmble Road Recycled Water Ponds <br />BSCO n <br />BS Civil Engineering <br />• Principal Engineer for Valley Center MWD Chalon Road Seasonal Storage Ponds <br />5°A Time Commitment <br />• Principal Engineer for Temescal Valley WD Pond Design <br />Tim Mull, PE, LEED AP <br />Lead Engineer <br />1B Yearsof Experience <br />MS, BS Civ Engineeringng <br />40%. Time Commitment <br />Neil Harper, PE <br />Pump Vault Design <br />19 Years of Experience <br />BS CIO Engineering <br />20% Time Commitment <br />• Lead Engineer for Lennar Home, The Lake Pond Design <br />• Project Engineer for Western Municipal Water District, Victoria Basin Recharge Pond Design <br />• Project Engineer for Fivepoint Communities Heritage Fields Drainage, Water Quality, Trails, and Lake <br />Features <br />• Vaull/Pump Analysis City of Santa Ana Centennial Park lake Rehabilitation Project Manual <br />• Pump Station Design for Eastern MWD North Tmmble Road Recycled Water Ponds and Pumps <br />• Pump Station Design for Santa Maria WWTP Percolation Pond Pumps <br />• Project Manager for Temescal Valley WD Pond Design acid Pump Stations <br />Greg Glen, PhD, PE <br />TreatmentDesign <br />• Treatment Lead for Eastern MIND ncante <br />D SJacinto Ehd Recharge and Recovery Program <br />6 Years of Experience <br />• eject Engineer for Valley Center MWD Wood Valley Ranch Water Reclamation Facility <br />_ <br />PhD, MS ClO Engineering <br />• Water Quality Investigation for San Clemente Island <br />15% Time Commitment <br />• Project Engineer for Olivenhain MWD 4S Ranch WRF Disinfection Alternatives <br />Colon Ramsey <br />• project Manager for Orange CountyWater District Mira Loma Recharge Basin EIR <br />CEGA B Resource Agency <br />• Project Manager for San Gorgonio Pass Water Agency Beuamont Ave Recharge Facilityand <br />Permitting <br />Pipeline EIR <br />8 Years of Experience <br />• Project Manageror San Lorenzo Community Park Master Plan MND <br />DUDEK Proposal for Centennial Lake Renovation 4 <br />25E-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.