Laserfiche WebLink
STATEMENT OF QUALIFICAITONS <br />:Project Name; Client� Contact <br />t <br />®. <br />Description <br />Enclave Mountain Estates <br />Dudek provided resident engineer and construction administration <br />Lake Reconstruction <br />services for the reconstruction of 4lakes within the residential <br />David Boger, Board Member, <br />community. Dudek also assisted with bid documents and determination <br />avebogerl@yahoo.com <br />of qualified bidders, reviewed bids for compliance with bidding and <br />Completed Sept 2016 <br />bonding requirements, recommended bid award, served as primary <br />point of contact between contractor and HOA representatives during <br />construction, reviewed material and equipment submittals, performed <br />periodic site visits and inspections of construction progress, reviewed <br />pay requests from the contractor, review and processed change orders, <br />directed contractor field staff for placement of lake features, and <br />provided final walk through inspection and punch list items. <br />Santa Maria W WTP <br />Dudek's engineers designed pumping, pipeline, and expanded <br />Percolation Ponds <br />percolation facilities on 241 acres of land owned by the City that was <br />City of Santa Maria <br />previously being contract farmed. Phase I of the Project designed <br />Shannon Sweeney, Water <br />facilities to accommodate 25% of the WWTP effluent capacity. Dudek's <br />Resources Manager, <br />engineers also investigated the use of a Bio -Filter to remove dissolved <br />805.925.0951 <br />nitrogen from the effluent prior to percolation. <br />Completed 2015 <br />Vision Agua Caliente Master <br />Dudek is providing civil engineering services for the Vision Agua <br />Plan <br />! Caliente project in downtown Palm Springs. The project will be <br />Agua Caliente Band of <br />completed in phases, the first phase included demolition of an existing <br />Cachuilla Indians <br />multi -story hotel and spa building on a 10 -acre site, installation of a <br />Rob Donnels, Tribal Engineer, <br />` <br />pump and bypass pipeline system for the natural hot water spring on <br />760.699.6800 - <br />the site a historic and cultural) sensitive resource for the Tribe Dudek <br />( Y )• <br />Currently in design <br />designed the collections, treatment, and reheat of the spring water, and <br />distribution to various pools and tubs each with their own treatment and <br />reheat systems. The project also included coordination of multiple utility <br />disconnects while planning for future redevelopment of the site, traffic <br />control and environmental compliance (SWPPP, dust control, etc.) <br />Temescal Valley PercolationDistrict <br />retained Dudek to design a lined recycled water storage with <br />Pond and Pump Station <br />geomembrane floating cover and onsite percolation basins. The new 2 <br />Temescal Valley Water District <br />million gallon water reservoir and 2.3 MGD pump station will relieve <br />CW Colladay, Board President, <br />operational constraints on recycled water production and delivery. <br />951.277.1414 <br />Excavation of approximately 70,000 CY for the new 2.5 acre percolation <br />Design completed Feb 2012 <br />basin will allow land disposal of plant effluent not needed in the recycled <br />water system. By incorporating a series of overflow structures and a <br />Csimple <br />feed -back control loop for sodium bisulfite addition, the new <br />effluent conveyance strategy will maximize availability of recycled water <br />and automatically divert excess dechlorinated recycled water to <br />Temescal Creek <br />North Trumble Rd RWPond <br />de <br />Dudek is s designed two new recycled water ponds that will provide the <br />Eastern Municipal Water <br />EMWD with approximately 1,500 acre-feet (489 million gallons) of <br />District <br />additional seasonal storage capacity. Each new pond will be <br />Fermin Balvandea, Senior Civil <br />constructed to a depth of approximately 50 feet. Features of the new <br />Engineer, 951.928.3777 <br />ponds include three 2,000 gpm floating pump stations, approximately <br />Design completed Feb 2015 <br />2,500 If of 16 -Inch to 36 -Inch inlet and discharge piping, and 36dnch <br />diameter steel pipelines and isolation valves to Interconnect the new <br />ponds to each other and to the existing adjacent Trumble Road <br />Recycled Water Pond. Access roads to the bottom of the ponds with <br />landing platforms for cranes will also be provided. The project also <br />includes improvements to two existing recycled water ponds, the 117 <br />MG Case Road Pond and the 50 MG Watson Road Pond. <br />DUDEK Proposal for Centennial Lake Renovation 17 <br />25E-30 <br />