My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT WATER ENGINEERING CONSULTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/18/2018
>
25E - AGMT WATER ENGINEERING CONSULTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 5:01:52 PM
Creation date
9/13/2018 4:56:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
9/18/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 Scope of Services and Schedule <br />2.1 Scope of Work <br />The following scope of work was developed to deliver a turnkey project to the City including obtaining <br />the necessary CEQA documentation and construction permits to construct the proposed lake <br />renovation plan elements and to coordinate the construction documents with OCWD's plan to modify <br />the existing main pump station wet -well to accommodate backwash water from their injection -well. <br />Our scope of work is intended to provide all of the design documentation, bid assistance, and <br />construction services necessary to completely renovate Centennial Lake as discussed In the Project <br />Approach above and to mitigate all of the current deficiencies identified in the 2016 lake rehabilitation <br />study. <br />Task 1: Preliminary Engineering (30% plans) <br />The Dudek team will begin Preliminary Engineering with a kick-off meeting with City staff to reconfirm <br />the project goals, discuss the project scope of work, and to discuss the project delivery schedule. <br />Dudek will also conduct a site meeting for the design team and City staff to document site conditions <br />and to review and discuss the various elements of the project and how they relate to the existing site. <br />Preliminary Engineering will also Include field work and subsequent meetings with City staff. Dudek <br />will prepare a 30% complete plan set and submit to the City for review and input. The 30% Centennial <br />Lake Renovation Plan set will Include the following sheets: <br />1. Title Sheet <br />2, Notes Sheet <br />3. Existing Conditions and Demolition Sheet <br />4. Site Plan / Lake Plan Sheets <br />5. Grading Plan Sheet <br />6. Plumbing & Piping Sheets <br />7. Lake Details Sheets <br />8. Water Feature Details Sheets <br />9. Pump Vault Details Sheets <br />10. Landscape Planting Plan Sheets <br />11. Landscape Planting Details Sheets <br />12. Landscape /Environmental /Fishery Details Sheet <br />13. Irrigation Plan Sheets <br />14. Irrigation Details Sheets <br />15. Electrical Wiring / Conduit Plan Sheets <br />16. Electrical Wiring Details and Diagrams Sheets <br />17. Signage Details Sheets <br />18. Lake / Fishery Specification Sheets <br />Upon completion of the 30% review by City staff, Dudek will prepare CEQA documentation of the <br />project. It Is our understanding that the City would like to process the proposed project under a <br />Categorical Exemption (CE) pursuant to Article 19 of the CEQA Guidelines. <br />DUDEK Proposal for Centennial Lake Renovation 20 <br />25E-33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.