My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT PEDESTRIAN DESIGN CONSULTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/18/2018
>
25F - AGMT PEDESTRIAN DESIGN CONSULTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 5:03:09 PM
Creation date
9/13/2018 4:56:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
9/18/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ma <br />Tetra Tech is currently providing <br />engineering services to prepare <br />plans, specifications, and <br />cost estimates (PS&E) for <br />the Templeton to Atescadero <br />Connector Trall. The project Is a <br />multi -use path, roughly one mile <br />in length, connecting northern <br />Atascadero to southern Templeton <br />between the Salinas River to <br />the east and Highway 101 to the <br />west. The Union Pacific Railroad <br />(UPRR) track bisects the site. The <br />Improvements Include a Class I <br />pathway with a clear span bridge <br />over Paso Robles Creek and a <br />railroad track under crossing. <br />The project scope Includes <br />completing and managing the <br />Caltrans Local Assistance and <br />Environmental Department <br />requirements and reports <br />necessary for Implementing a <br />Federal Highway Administration <br />20 DESIGN SERVICES RFP NO.: 18-042 <br />and State Highway Administration <br />grant funded project. Tetra Tech <br />Is providing pathway design and <br />approach engineering, quantity <br />calculations, environmental <br />studies and surveys for NEPA/ <br />CEQA, preparation of permit <br />applications, right-of-way <br />engineering and acquisition, utility <br />coordination, UPRR coordination, <br />hydraulic analysis, geotechnical <br />engineering, topographic <br />surveying, cost estimating, bid <br />and construction assistance, and <br />preparation of a complete plans, <br />specifications, and cost estimates <br />(PS&E) package. <br />The ultimate goal of the pathway <br />network is to provide connectivity <br />between Templeton and <br />Atascadero, facilitating safe and <br />attractive transportation between <br />these two towns and encouraging <br />alternative transportation modes. <br />25F-35 <br />Templeton, California <br />Client Name <br />County of San Luis Obispo <br />General Services Agency <br />Year Completed <br />September 2014.Ongoing <br />Contact Person <br />County of San Luis Obispo <br />General Services Agency <br />1087 Santa Rosa Street <br />San Luis Obispo, CA 93408 <br />Elizabeth Kavanaugh <br />T. 805(181.4089 <br />E: ekavanaugh@co.slo.ca.us <br />Project Highlights .: <br />Plans, Specillcatlon% and <br />Estimate <br />. CEQA(NEPAProcesses <br />Right -of -Way Acq uisition:..: <br />i�.:Grant Administration. <br />Topographic Survey <br />.; HydrologyMydraulicAnalysis <br />Permitting Assistance <br />UPPR Coordination.. <br />Undercrpong..at UPRR Tracks <br />Pedesriari fridge +- <br />
The URL can be used to link to this page
Your browser does not support the video tag.