Laserfiche WebLink
City of Santa Ana <br />Civil Details <br />14-15 C42 to C-13 <br />&62516 <br />25.2y , <br />Signing and .Wpmg Plans r <br />1618.....G14 <br />TS -28 Traffic Signal Notes <br />29.TrafficSi an <br />30 <br />TS -30 <br />#fl Signal Details <br />31 <br />SL 31 <br />Street Lightlri Legend <br />`and One;Lihe, <br />3219 <br />614E-1 <br />Street Light ng Plan <br />3320, <br />. :8L 3 E 2 <br />; Street ughfirig 1)etalls <br />34-3621 <br />L-3+} L-1 <br />Landscape Planting and <br />Construction Plan <br />33922. <br />.4412 <br />IrrigationPlzn: <br />39-42 23 <br />L-3 <br />Landscape and Lighting Details <br />Electronic copies of Special Provisions (SSPs) <br />(in MS Word showing tracked changes) with <br />electronic submittals: as SSPs, with 90% level <br />quantities and estimates, pay Item list, design <br />calculations, and draft Reports <br />v' Electronic copies of cost estimate and check <br />quantity calculations Electronic copies of design <br />calculations <br />ra Electronic copies of design check calculations <br />Electronic copies of WOMP and Soils Report to <br />a 90% level <br />Tetra Tech will provide the Final PS&E documents <br />for review and approval of the City in both hardcopy <br />and electronic copy per the RFP requirements <br />and they will be ready to advertise the project for <br />construction. <br />28 DESIGN SERVICES RFP NO.: 18-042 <br />V Bid & Construction <br />Support <br />Tetra Tech will be available to respond to any <br />questions or items requiring Interpretation In the <br />drawings or specifications are discovered during <br />the bidding period. Our design team will respond <br />to any RFIs (Requests for Information) throughout <br />the Construction and advertisement phases of the <br />project within three working days. Any RFIs will first <br />be analyzed by Tetra Tech and a recommendation <br />will then be provided to the City, and/or through an <br />amendment or change order. Tetra Tech will also be <br />available to review any proposed addenda. Bid and <br />Construction Support Services will also include: <br />F Attending the pre -construction meeting with <br />the successful construction contractor upon <br />notification by the City, <br />Review of submittals and shop plan drawings <br />required to support the construction contract <br />Tetra Tech will complete shop drawings reviews <br />within two (2) weeks of receipt, Contract Change <br />Order reviews will be completed within two (2) <br />working days of receipt. <br />€i Tetra Tech will be available as requested by the <br />City to resolve:discrepancies In the contract <br />documents and understands we have no authority <br />to issue instruction on behalf of the City, or to <br />deputize another to do so. <br />,: Tetra Tech will prepare and deliver to the City <br />the final as -built plans incorporating field marked <br />prints supplied by the City. All changes to the <br />plans will be incorporated electronically with all <br />necessary revision notations and submitted to the <br />City. An electronic file will be submitted to the City <br />In Microstation V81 CADD and pdf formats for the <br />final as-butit plans via CD, email or through an <br />FTP site as required by the City, <br />V Assumptions and <br />Exclusions <br />- Base map will show record boundary and a <br />full boundary establishment survey will not be <br />performed. <br />i Topographic Survey will be performed by aerial or <br />scan without encroaching Into the rail road ROW. <br />25F-43 <br />