Laserfiche WebLink
PRINCIPAL-IN-CHARGEILANDSCAPE ARCHITECT - SAN LUIS OBISPO, CA <br />Mr. Argenta has more than 27 years of combined planning and <br />engineering experience In both the public and private sectors. <br />Education <br />Mr. Argente's main strength Is leading complex multi -disciplinary <br />; Niasiei•;Arctiltecture Studies,:; <br />projects given his previous experience as a city planner, a <br />:Cat Poly San:Luis.Obispo,; <br />landscape architect, and project manager of teams of engineers <br />and scientists, Mr. Argente possesses unique qualifications to <br />BS,; Landscape Architecture; <br />integrate engineering science with equal attention to environmental <br />: - .. Foly,San Luis Obispo; %-_ <br />and aesthetic concerns. In essence, Mr. Argente Is a landscape <br />1991:' <br />architect that has a solid understanding of hydrology, hydraulics, <br />earthworks, Infrastructure, and construction, As Increased urban <br />Registrations ` <br />development affects our environment, Mr. Argente has evaluated <br />::Professional Landscape.; <br />and Implemented solutions that lessen the environmental Impacts of <br />.:Arcfiiteci; CalifofiiaiN& 4129':, <br />projects or turn them Into environmental assets for the communities. <br />.... .. <br />:`.QualiFetl;S.WI?P.P developed•:.;;; j <br />Relevant Experience <br />P(crtascptittiaonner-(QS Pfi)e; dC8eVrt1ifi1PcPateJ': <br />Sixth Street Park, Arts, River and Connectivity (PARC) <br />No -_21105 <br />Project, City of Los Angeles Bureau of Engineering, Los <br />EnvisionTm Sustafnability <br />Angeles, CA. Principal -In -Charge responsible for overseeing the <br />Accredited Professional <br />schematic and final design, environmental documentation and <br />USGBC LEED Certification <br />permitting, public presentations, construction support services, <br />N/orksFiops:; <br />and post -construction services for nearly 12 acres of recreational <br />and open spaces beneath and around the new bridge. The <br />APrgect Management <br />project includes approximately % mile of Improvements within the <br />PSMJ. PM:Workshop :•: <br />Los Angeles River. These Improvements will include bike trails,:. <br />Tetra Tecli,P.rojecr <br />pedestrian access, and softening of the existing concrete lined <br />Management series <br />channel. These. improvements were originally envisioned in the <br />Los Angeles River Revitalization Master Plan that Tetra Tech <br />Profes§Iona) Affiliations::>:<.:' <br />completed. The City's goal Is to make the landscape component <br />ASLA American Society of <br />under the new bridge a world class public space that will Include <br />Landscape Architects: <br />an Arts Plaza, several performance stages, synthetic sports <br />• CELSOC Consulting <br />fields, river terracing, and bicycle and pedestrian pathways. <br />Engmeers.ani <br />Albion Riverside Park Project, City of Los Angeles Bureau of <br />Surveyors of Califotpia <br />Engineering, Los Angeles, CA. Project Manager. Project Manager <br />ears of Experience <br />responsible for overseeing the pre -design services, Including the <br />Envision certification process, forthe Albion Riverside Park project. <br />27 <br />Tetra Tech Is providing design and construction support services. <br />The project, located adjacent to the Los Angeles River, Involves <br />transforming a six -acre site, previously used for dairy warehousing <br />and distribution, into a riverfront park and recreational facility that <br />will benefit nearby disadvantaged low income neighborhoods. In <br />addition, the City Is using the redeveloped property to Increase the <br />current capacity for managing storm water runoff. This Important <br />water quality project is part of the City's overall efforts through the <br />Proposition 0 Bond Program to Improve water quality and reduce <br />pollutant loads that are currently being conveyed to the rivers, lakes, <br />and oceans within the greater Los Angeles area. <br />25F-52 <br />