Laserfiche WebLink
25F-56 <br />Jason Fussel, . AP,QSD/. <br />QA/QC • SAN LUIS OBISPO, CA <br />Mr. Jason Fussel has over 15 years of experience and has a broad <br />..._ ` .. .. <br />knowledge of civil engineering stemming from his involvement <br />Educa#'ion <br />In capital Improvement projects across Southern California. HeB;S <br />Civil Engineering;:::`. <br />Is sought after for both his value engineering and his quality <br />Gahfornia Polytechnic State <br />control capabilities. Mr. Fussel's strengths include precise grading <br />lJniversity,, Sari Luis Obispo,.:: , .. <br />and paving, stormwater and water resources, and structures. <br />He excels in the design oversight of plans, specifications, and <br />estimates (PS&E) for public bid. His vast experience will allow him <br />to for technical <br />Registered Professional <br />provide critical reviews quality, cost efficiency, and <br />constructability. <br />Engineer, Ca.0 rnia:No; <br />70879,`la.nuary'20.07:';'% <br />Relevant Experience <br />:: Registered Professional:Land '.::..; <br />Taylor Yard Bikeway and Pedestrian Bridge, Studio Pall <br />8uryeyor, California No ,9006 <br />May 2013 ? I <br />Fekete Architects for the City of Los Angeles, Los Angeles, <br />i:. ualifed SWPPP Develo'p'er. <br />CA, Project Engineer and Engineer of Record. Mr, Fussel is <br />responsible for providing civil engineering services for a 420 -feet long <br />':(QSD): and .Qualifiad"SWPPP; . <br />modern style and aesthetically distinctive pedestrian/bikeway bridge <br />- Practitioner: QS,P. No: 20231;: <br />$eptember2012 <br />crossingthe Los Angeles River. The pedestrian bridge will carrytwo <br />lanes of pedestrian, bicycle traffic, two DWP recycled water lines and <br />EnvisionTM Sustaipabilk ,.' <br />include scenic views of the Los Angeles River. The project will be solar <br />Professional :March 2014,: <br />powered, from the LED bridge and pathway lighting and signage to <br />LEED®Accredited - <br />the Irrigation systems. <br />Professional,.-February'2009 <br />Sixth Street Park, Arts, River and Connectivity (PARC) <br />Professional Aff llatlohs :.; <br />Project, City of Los Angeles Bureau of Engineering, <br />Los Angeles, CA. Technical Advisor. Mr. Fussel is serving as <br />o American :$ociety' of <br />technical advisor for the schematic and final design, environmental <br />Engineers <br />a Califomra Land Surveyors <br />Calif6 iA.L-:.i.n <br />documentation and permitting, public presentations, construction <br />,. <br />support services, and post -construction services for nearly 12 acres <br />of recreational and open spaces beneath and around the new bridge."`' <br />The includes Vi <br />`Years .ot:Experience.(:::i:; <br />project approximately mile of improvements within <br />the Los Angeles River. These improvements will Include bike trails, <br />15 <br />pedestrian access, and softening of the existing concrete lined <br />channel. These Improvements were originally envisioned in the Los <br />Angeles River Revitalization Master Plan that Tetra Tech completed. <br />The City's goal Is to make the landscape component under the new <br />bridge a world class public space that will include an Arts Plaza, <br />- <br />several performance stages, synthetic sports fields, riverterracing,------------ <br />or <br />and bicycle and pedestrian pathways. <br />Shell Beach Road Streetscape Project, City of Pismo Beach, <br />Pismo Beach, CA. Project Engineer. Mr. Fussel is serving as Project <br />Engineer for the design of a "total street" reconstruction of 18 blocks <br />of Shell Beach Road in the City of Pismo Beach, The project entails <br />Incorporating a new Class 1 bikeway along an existing Caltrans <br />right-of-way (Highway 101). In addition, the project alms to replace <br />aging utilities, including: a new 12" water line, new 12" reclaimed <br />water line, undergrounding power and communication lines, and <br />new storm drain Improvements. The project will incorporate new <br />25F-56 <br />