CIVIL DESIGN- IRVINE, CA,
<br />Mr. Parra has experience In the design of residential, commercial,
<br />'..
<br />and municipal development projects. He is proflolent In the design
<br />Education
<br />and preparation of construction documents for design of roads,
<br />C'Lvil Engineering,'._
<br />highways, bike paths, and parkingereas, Including signing and
<br />C.411 .rnia.PolyteciinicState " . .
<br />striping plans.
<br />UniJersi(y; San'Lu'is'Otiispo;. .:
<br />Mr. Parra has comprehensive knowledge of AutoCAD Civil 3D,
<br />Regiis... it ns ':
<br />AutoCAD 2014, GIS, as well as various hydraulic/hydrologic analysis
<br />Engine.er-in Training(El T�,`-. ;
<br />software programs to solve complex engineering Issues and to
<br />California; N'.1 2718 ..
<br />analyze the interaction of utilities, grading, and drainage during
<br />years of.'Experience
<br />the design process. He is experienced In WaterCAD, StormCAD,
<br />-
<br />FlowMaster, HEC -RAS, HEC HMS, EPA SWMM, HCS 2010 and
<br />MATLAS programming.
<br />Mr. Parra has experience implementing the State Water Board
<br />requirements for preventing and mitigating stormwater pollutants
<br />and assisting In preparing Stormwater Pollution Prevention Plans
<br />(SWPPP). He is also experienced In preparing WQMP's and SUSMP's
<br />for development and redevelopment projects.
<br />Relevant Experience
<br />Pacoima Wash Mountain Bikeway, Mia Lehrer and Associates
<br />for Mountains Recreation & Conservation Authority (MRCA),
<br />Los Angeles, CA. Design Engineer responsible for preparing
<br />hydrology and hydraulic calculations for mod'rfications and additions
<br />to the storm drain system for the proposed pedestrian bridge over
<br />Pacoima Wash. Tetra Tech was contracted by landscape architects
<br />Mia Lehrer + Associates (MLA) to prepare the plans, specs, and
<br />estimates for the design and construction of a 3,25 -mile Class
<br />I Bikeway, including multi -phase planning, design coordination,
<br />administrative approval process and preparation of engineering and
<br />:: ; • "f`:- . :-`.
<br />construction plans. The new bikeway connects densely -populated
<br />areas of the San Fernando Valley to each other, to existing future
<br />parks and amenities, and to the Angeles National Forest. The design
<br />of the Class I bike path consists of protective fencing along the wash,
<br />signage and striping of existing service roads, approximately 1.5 miles
<br />paved areas, striping of street crossings, protected crossing of a rail
<br />bridge, Inclusion of additional bridge crossings over Pacoima Wash,
<br />and native landscape planting and irrigation. The bikeway will be
<br />planned as multi -use (bicycle, pedestrian and equestrian) and where
<br />space allows, a separate and protected path for pedestrians will be
<br />Incorporated into the design for maximum safety of users.
<br />Upper San Gabriel EWMP Stormwater Capture Projects,
<br />City of Industry, Various Locations, CA. Design Engineer.
<br />Development of the site Improvements, diversion structure,
<br />pretreatment, underground storage reservoirs, and piping systems.
<br />Tetra Tech was contracted by the City of Industry to evaluate
<br />seven potential site locations for the development of the Upper
<br />25F-62
<br />
|