San Gabriel EWMP Stormwater
<br />Capture Project: Allen J. Martin
<br />Park, Barnes Park, Cortez Park,
<br />Flnkbiner Park, La Puente Park,
<br />San Angelo Park, and Wingate
<br />Park site. The project components
<br />will Include a diversion structure
<br />to divert water from one of the
<br />major flood control channels, a
<br />pretreatment structure to remove
<br />debris from the runoff, and an
<br />underground structure to infiltrate
<br />or capture the water that will be
<br />treated for landscape Irrigation
<br />use.
<br />Caruthers Park Stormwater
<br />and Urban Runoff Capture
<br />Project, Bellflower, CA. Design
<br />Engineer. Development of the site
<br />Improvements, diversion structure,
<br />pretreatment, underground
<br />storage reservoirs, and piping
<br />systems. Tetra Tech was
<br />contracted by the City of Bellflower
<br />to prepare Improvement plans
<br />for the existing Caruthers Park
<br />adjacent to the San Gabriel River
<br />located In the City of Bellflower.
<br />The project components include
<br />a diversion structure to divert
<br />water from one of the major flood
<br />control channels, a pretreatment
<br />structure to remove debris from
<br />the runoff, and an underground
<br />structure to Infiltrate or capture
<br />the water that will be treated for
<br />landscape Irrigation use.
<br />GRIP Advanced Water
<br />Treatment Facility, WRD,
<br />Pico Rivera, CA. Design
<br />Engineer. Development of site
<br />plans, parking stall, curb and
<br />gutter configurations, drainage,
<br />grading, and retaining walls.
<br />Tetra Tech was contracted by the
<br />Water Replenishment District
<br />of Southern California to design
<br />an Advanced Water Treatment
<br />Facility (AWTF) Including precise
<br />grading, preparation of hydrology
<br />and hydraulic calculations for the
<br />site drainage, curb, gutter, and
<br />sidewalk designs.
<br />California State University
<br />Long Beach, Lot 7 Parking
<br />Area Renovation, Long Beach,
<br />CA. Design Engineer. Development
<br />of site plans, parking stall, curb
<br />and gutter configurations, drainage,
<br />grading, and retaining walls. The
<br />University developed a conceptual
<br />plan showing the reconfiguration
<br />and renovation of Parking Lot 7
<br />to increase the total number of
<br />spots, Improve circulation, end
<br />create an enhanced entrance
<br />to the southeast portion of the
<br />campus. Tetra Tech was contracted
<br />to prepare final construction
<br />plans including precise grading,
<br />storm drain Improvement plans,
<br />preparation of hydrology and
<br />hydraulic calculations for the
<br />site drainage, curb, gutter, and
<br />sidewalk designs.
<br />Orangethorpe Avenue
<br />Widening, Phase 11, Indiana
<br />Avenue to Kass Drive, City of
<br />Buena Park, Buena Park, CA.
<br />Design Engineer. Responsible
<br />for the development of plan
<br />and profile, geometric design,
<br />conceptual striping plans,
<br />drainage, utilities research and
<br />relocation. Tetra Tech Is providing
<br />topographic surveys, plans and
<br />profile design sheets, traffic control
<br />sheets, striping sheets and cross-
<br />sections for street widening along
<br />the south side of Orangethorpe
<br />Avenue.
<br />Patton Basin Drainage Outlet,
<br />City of San Bernardino,
<br />Public Works Department,
<br />San Bernardino, CA. Design
<br />Engineer. Responsible for hydrology
<br />and hydraulic calculations, site
<br />plans, development of 48 -inch
<br />drainage pipe and outlet plan and
<br />profile. Tetra Tech is providing
<br />preliminary engineering design
<br />Including site investigation, data
<br />collection, hydrology and hydraulic
<br />25F-63
<br />analysis to repair the badly
<br />damaged drainage system caused
<br />by years of excessive discharges
<br />In combination with surface runoff
<br />which led to the undermining of
<br />48 -Inch RCP and collapse of the
<br />outlet system and concrete chute
<br />off of Victoria Boulevard.
<br />Newhall Ranch Land
<br />Development, Mission
<br />Village, The Newhall Land
<br />and Farming Company,
<br />Valencia, CA. Design Engineer.
<br />Development of street plans,
<br />profile sheet sets, slgning and
<br />striping in compliance with
<br />county codes and regulations.
<br />Performed engineering analysis
<br />to ensure functionality in the
<br />roadway and intersection designs
<br />with the safety of road users in
<br />mind. The Mission Village project
<br />consisted of the development of
<br />residences Including townhomes,
<br />condominiums, apartments and
<br />single-family homes to create
<br />a new "downtown" urban living
<br />environment.
<br />La Palma and State Collar
<br />Boulevard Intersection, City of
<br />Anaheim, Anaheim, CA. Design
<br />Engineer. Responsible for the
<br />development of plan and profile,
<br />geometric design, and conceptual
<br />striping plans. Tetra Tech Is
<br />providing topographic surveys,
<br />plans and profile design sheets,
<br />traffic control sheets, and striping
<br />sheets for street widening at the
<br />Intersection of East La Palma
<br />Avenue and North State College
<br />Boulevard.
<br />
|