Laserfiche WebLink
GEOMETRiCS/ADA COMPLIANCE ! PROJECT ENGINEER ^ IRVINE, <br />CA, <br />Mr. Vu has more than 22 years of civil engineering and design <br />experience. His background includes extensive road, utility, water, <br />sewer and storm drain design for public agencies. His experience <br />�BS, Civil Fngirieering, <br />includes coordination with stakeholders Including state and local <br />":Univetsity.of California, Irvine,;.:; <br />agencies, utility companies, as well as private businesses to <br />1995 <br />successfully deliver complex projects. Mr. Vu has a solid working <br />Registrations <br />knowledge of AutoCAD, Land Desktop Development, Civil 31), <br />MlcroStatlon V81, Civil Design, AES, WSPG, FlowMaster, and MORALiceriseil:Professorial <br />':. ;::;.;•: <br />software. <br />I ri,Calif6rnia;; <br />61015;2000::'::,,: <br />Relevant Experience <br />Years' of. Experience- `.'.;:•: <br />Active Transportation Project (ATP) 2 and 3, City of Los <br />Angeles, Bureau of Engineering, Los Angeles, CA. Project <br />Engineer. Responsible for quantity takeoff and cost estimate for the <br />:.:::.. . <br />Boyle Heights Linkage Project active transportation projects (ATP 2). <br />The goal of ATP 2 is to improve pedestrian safety and access to the City <br />of Los Angeles' Sixth Street Viaduct and Sixth Street PARC Projects, <br />specifically aiming to improve the pedestrian circumstances for users <br />of the Aliso Pico Recreation Center, Pecan Recreation Center, and Boyle <br />Heights Technology Youth Center. A second ATP project, ATP 3 , benefits <br />the Downtown Los Angeles Arts District. The ATP 3 Project will provide <br />pedestrian and cyclist Improvements including new cycle tracks, bike <br />lanes, bike routes, new and widened sidewalks with curb extensions, <br />new traffic controlled intersections, a new shared street connecting <br />to the now Sixth Street Viaduct Arts Plaza, as well as green street <br />elements. The goal of these two Caltrans Local Assistance Program <br />funded projects is to Increase the mobility and safety for non -motorized <br />users to achieve the regional agency's greenhouse gas reduction <br />goals, and aid In the enhancement of the pubAc's health. Tetra Tech is <br />currently preparing the Pre -Design Reports for both the ATP 2 and ATP <br />3 project. <br />Realignment of Culver Boulevard, City of Culver City, Culver <br />City, CA. Project Engineer. Responsible for pavement design, utility <br />relocation, roadway plans and profiles, and ADA ramps. Tetra Tech <br />is contracted by the City of Culver City to prepare final construction <br />plans and specifications for the widening of Culver Boulevard between <br />Sepulveda Boulevard and Hands Street. The project consists of <br />roadway reconfiguration, Including new raised median on Culver <br />Boulevard separating east and west bound traffic lanes and left turn <br />pockets, reconfiguration of the existing raised landscaped bicycle and <br />pedestrian median on the north side of Culver Boulevard, new traffic <br />signals, sidewalk replacement, street lighting replacement, bus pads, <br />drought -resistant landscaping for the medians, and a bloswale in the <br />north median to capture water run-off. <br />Potrero Canyon Park Development Project, City of Los <br />Angeles, Bureau of Engineering, Los Angeles, CA. Design <br />Engineer, Responsible for preparing the final Plans, Specification, <br />25F-64 <br />