GEOMETRiCS/ADA COMPLIANCE ! PROJECT ENGINEER ^ IRVINE,
<br />CA,
<br />Mr. Vu has more than 22 years of civil engineering and design
<br />experience. His background includes extensive road, utility, water,
<br />sewer and storm drain design for public agencies. His experience
<br />�BS, Civil Fngirieering,
<br />includes coordination with stakeholders Including state and local
<br />":Univetsity.of California, Irvine,;.:;
<br />agencies, utility companies, as well as private businesses to
<br />1995
<br />successfully deliver complex projects. Mr. Vu has a solid working
<br />Registrations
<br />knowledge of AutoCAD, Land Desktop Development, Civil 31),
<br />MlcroStatlon V81, Civil Design, AES, WSPG, FlowMaster, and MORALiceriseil:Professorial
<br />':. ;::;.;•:
<br />software.
<br />I ri,Calif6rnia;;
<br />61015;2000::'::,,:
<br />Relevant Experience
<br />Years' of. Experience- `.'.;:•:
<br />Active Transportation Project (ATP) 2 and 3, City of Los
<br />Angeles, Bureau of Engineering, Los Angeles, CA. Project
<br />Engineer. Responsible for quantity takeoff and cost estimate for the
<br />:.:::.. .
<br />Boyle Heights Linkage Project active transportation projects (ATP 2).
<br />The goal of ATP 2 is to improve pedestrian safety and access to the City
<br />of Los Angeles' Sixth Street Viaduct and Sixth Street PARC Projects,
<br />specifically aiming to improve the pedestrian circumstances for users
<br />of the Aliso Pico Recreation Center, Pecan Recreation Center, and Boyle
<br />Heights Technology Youth Center. A second ATP project, ATP 3 , benefits
<br />the Downtown Los Angeles Arts District. The ATP 3 Project will provide
<br />pedestrian and cyclist Improvements including new cycle tracks, bike
<br />lanes, bike routes, new and widened sidewalks with curb extensions,
<br />new traffic controlled intersections, a new shared street connecting
<br />to the now Sixth Street Viaduct Arts Plaza, as well as green street
<br />elements. The goal of these two Caltrans Local Assistance Program
<br />funded projects is to Increase the mobility and safety for non -motorized
<br />users to achieve the regional agency's greenhouse gas reduction
<br />goals, and aid In the enhancement of the pubAc's health. Tetra Tech is
<br />currently preparing the Pre -Design Reports for both the ATP 2 and ATP
<br />3 project.
<br />Realignment of Culver Boulevard, City of Culver City, Culver
<br />City, CA. Project Engineer. Responsible for pavement design, utility
<br />relocation, roadway plans and profiles, and ADA ramps. Tetra Tech
<br />is contracted by the City of Culver City to prepare final construction
<br />plans and specifications for the widening of Culver Boulevard between
<br />Sepulveda Boulevard and Hands Street. The project consists of
<br />roadway reconfiguration, Including new raised median on Culver
<br />Boulevard separating east and west bound traffic lanes and left turn
<br />pockets, reconfiguration of the existing raised landscaped bicycle and
<br />pedestrian median on the north side of Culver Boulevard, new traffic
<br />signals, sidewalk replacement, street lighting replacement, bus pads,
<br />drought -resistant landscaping for the medians, and a bloswale in the
<br />north median to capture water run-off.
<br />Potrero Canyon Park Development Project, City of Los
<br />Angeles, Bureau of Engineering, Los Angeles, CA. Design
<br />Engineer, Responsible for preparing the final Plans, Specification,
<br />25F-64
<br />
|