My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENSLER
Clerk
>
Contracts / Agreements
>
G
>
GENSLER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2021 5:06:14 PM
Creation date
9/18/2018 12:14:17 PM
Metadata
Fields
Template:
Contracts
Company Name
GENSLER
Contract #
A-2018-201
Agency
PUBLIC WORKS
Council Approval Date
8/21/2018
Expiration Date
8/20/2021
Insurance Exp Date
3/1/2022
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kimley>>> H®rn <br />Scope of work for the project consisted of surveying, geotechnical investigation, pavement <br />design, environmental studies (CEQA and Phase I Site Assessment), R/W acquisition, traffic <br />studies, traffic signal design, street lighting, Active Transportation, and construction bid <br />documents for the project. <br />Frazier Street Pedestrian Safety and Bike Lane, Baldwin Park, CA — Project manager for <br />the design of more than one mile of corridor along Frazier Street. Project's main objectives were <br />enhancing pedestrian safety and adding a class II bike lane to the street. Bulb -outs and curb <br />extensions were added to intersection as traffic calming measures. Work also included <br />pavement rehabilitation, ADA improvement, landscaping, and high visibility crosswalks. <br />Bus Shelter Improvement Project, City of Baldwin Park, CA — Aryo was project manager for <br />the City's bus shelter improvement project. The Project was for engineering design services for <br />Citywide Bus Stops Evaluation and Design. Design Phase of the project included; conducting <br />field survey to verify current City's Bus Stops Master Plan, Evaluation of existing bus stops for <br />ADA compliance, Right -of -Way research, field review for any need for improvement of existing <br />street features, and preparation of design package (Plans, Specifications and Cost Estimate) for <br />construction of the Project. The design phase also included preparation of five alternative <br />architectural design for new bus shelters and bus stops amenities. <br />Montebello/Commerce Metrolink Station ADA Improvements, City of Montebello, CA — <br />Aryo was responsible for project management and design for this project to upgrade the <br />Metrolink Station to meet current ADA requirements at ramps, sidewalks and commuter <br />locations. This encompassed the path of travel from Flotilla Street; along the entrance road, <br />roadway crossings, rolling gate track, path of travel from rail platform to bus loading/unloading <br />zone or the parking lot; the existing ramps and sidewalks from the handicap parking to the <br />platform ramp and ramps on the platform for access to the trains. Scope of services included <br />surveying, field measurement, site assessment report, conceptual plans, ADA design and <br />preparation of bid package (PS&E) for construction phase. <br />Bus Shelters Improvement at Various Locations, City of Hawaiian Gardens, CA —Aryo led <br />a design team for City's bus shelter improvement project to replace or upgrade existing bus <br />shelters at various locations. The scope included the design, purchase and installation of the <br />shelters along with benches, trash cans and solar powered lighting. In addition, the existing <br />shelters were repaired and painted. The Federal Transportation Administration (FTA) provided <br />the primary project funding along with Los Angeles County TDA and City funds. Scope of <br />services encompassed concept design, field verification, preparation of site plans, specifications <br />and cost estimate, bid support services, construction management and construction inspection <br />services. <br />Bus Shelter ADA Compliance Evaluation, City of Montebello, CA — Aryo was project <br />manager for Montebello's Bus Shelter ADA Compliance Evaluation. The scope of work included <br />visiting City's existing 141 bus shelters to review and evaluate each bus shelter for compliance <br />with the latest ADA Regulations. The scope of work also included preparation of a report for <br />existing bus shelter and bus stop amenities condition consisting of required repairs and <br />construction work. Part of this project, City's bus route map and data base were updated to <br />reflect latest existing facilities on each bus stop. Project also encompassed preparation of plans, <br />specifications and cost estimate for the repairs and alteration for each bus stop. <br />Gensler i Santa Aria Regional Transportation Bike Station <br />
The URL can be used to link to this page
Your browser does not support the video tag.