<br />Fairmont Boulevard Widening Preliminary Study, Anaheim, CA — Principal Design Engineer
<br />responsible for the preparation of conceptual plans, design alternatives, cost estimates,
<br />hydrology study, and project study report for approximately one mile of arterial roadway from
<br />Santa Ana Canyon Road to Canyon Rim Road. Project was for widening of Fairmont Boulevard
<br />from one lane in each direction to two lanes while improving other street features such as
<br />landscaping. Design considered sustainable measures such as green street design for the
<br />street. Specific work included geotechnical investigation, detailed field observations, aerial and
<br />field surveys, conceptual plans, cost estimates, and project study report for improvements of the
<br />street.
<br />Atlantic Boulevard and Slauson Avenue Business District Revitalization, Maywood, CA —
<br />Design Lead Engineer responsible for preparation of design package and construction support
<br />for approximately two miles of arterial roadway from the Slauson Avenue/Atlantic Boulevard
<br />intersection to the South, north and West City limit. Specific scope of work included
<br />geotechnical investigation, field survey, new median island, street geometry design, street
<br />beautification, pavement rehabilitation, landscaping and irrigation, signing and striping, and final
<br />plans, specifications and cost estimates.
<br />San Gabriel Valley Class I Bikeway, Baldwin Park, CA — Project Manager responsible for
<br />preparation of design package and permits for construction of a new 2.5 mile class I bikeway in
<br />the City of Baldwin Park. The project connects existing City's class I and class II bike facilities
<br />along the San Gabriel River and Baldwin Park Boulevard respectively. Specific work included
<br />ground and aerial surveying, environmental studies, bikeway alignment study, hydrology study,
<br />NPDES and SWPPP, and project's permits for Caltrans, LACFCD, CA -Fish and Wild Life, and
<br />LA County.
<br />Rosemead Boulevard and Mines Avenue Intersection Improvement, Pico Rivera, CA —
<br />Project Manager for the design and construction phases. Main project goals were traffic calming
<br />with adding bulb -outs to Mines Avenue as well as traffic signal upgrade, street beautification,
<br />and pavement rehabilitation. Work included; street improvement, pedestrian safety
<br />improvement, highway safety improvement, bulb -outs, new traffic signal, drainage analysis,
<br />ADA improvement, landscaping, and signing and striping.
<br />Washington Boulevard Improvements, Montebello, CA — Project Manager for design of
<br />more than 6,000 linear feet of a primary arterial roadway. Washington Boulevard is located in
<br />commercial and industrial area in the City of Montebello. Improvement items included street
<br />rehabilitation, concrete pavement intersection, ADA improvements, new median islands,
<br />landscaping, and signing and striping. Work consisted of preparation of Plans, Specifications
<br />and Cost Estimate as well as bid and construction support.
<br />Gene Autry Way Improvements, City of Anaheim, CA — Project Engineer assisting with the
<br />final design services to improve Gene Autry Way and the west side of State College Boulevard
<br />adjacent to the main Angel Stadium ingress/egress point. The project will widen both streets
<br />to increase capacity while providing space for bicyclists and facilities for pedestrian circulation.
<br />Multiple bio-retention facilities are being provided to comply with SWRCB requirements in north
<br />Orange County. The project also includes R/W acquisition, necessary modifications to adjacent
<br />properties, utility relocations, traffic signals, lighting, and special considerations related to Angel
<br />Stadium event traffic.
<br />Gensler i Santa Ana Regional Transportation Bike Station