Laserfiche WebLink
Kimley>>)Horn <br />Fairmont Boulevard Widening Preliminary Study, Anaheim, CA — Principal Design Engineer <br />responsible for the preparation of conceptual plans, design alternatives, cost estimates, <br />hydrology study, and project study report for approximately one mile of arterial roadway from <br />Santa Ana Canyon Road to Canyon Rim Road. Project was for widening of Fairmont Boulevard <br />from one lane in each direction to two lanes while improving other street features such as <br />landscaping. Design considered sustainable measures such as green street design for the <br />street. Specific work included geotechnical investigation, detailed field observations, aerial and <br />field surveys, conceptual plans, cost estimates, and project study report for improvements of the <br />street. <br />Atlantic Boulevard and Slauson Avenue Business District Revitalization, Maywood, CA — <br />Design Lead Engineer responsible for preparation of design package and construction support <br />for approximately two miles of arterial roadway from the Slauson Avenue/Atlantic Boulevard <br />intersection to the South, north and West City limit. Specific scope of work included <br />geotechnical investigation, field survey, new median island, street geometry design, street <br />beautification, pavement rehabilitation, landscaping and irrigation, signing and striping, and final <br />plans, specifications and cost estimates. <br />San Gabriel Valley Class I Bikeway, Baldwin Park, CA — Project Manager responsible for <br />preparation of design package and permits for construction of a new 2.5 mile class I bikeway in <br />the City of Baldwin Park. The project connects existing City's class I and class II bike facilities <br />along the San Gabriel River and Baldwin Park Boulevard respectively. Specific work included <br />ground and aerial surveying, environmental studies, bikeway alignment study, hydrology study, <br />NPDES and SWPPP, and project's permits for Caltrans, LACFCD, CA -Fish and Wild Life, and <br />LA County. <br />Rosemead Boulevard and Mines Avenue Intersection Improvement, Pico Rivera, CA — <br />Project Manager for the design and construction phases. Main project goals were traffic calming <br />with adding bulb -outs to Mines Avenue as well as traffic signal upgrade, street beautification, <br />and pavement rehabilitation. Work included; street improvement, pedestrian safety <br />improvement, highway safety improvement, bulb -outs, new traffic signal, drainage analysis, <br />ADA improvement, landscaping, and signing and striping. <br />Washington Boulevard Improvements, Montebello, CA — Project Manager for design of <br />more than 6,000 linear feet of a primary arterial roadway. Washington Boulevard is located in <br />commercial and industrial area in the City of Montebello. Improvement items included street <br />rehabilitation, concrete pavement intersection, ADA improvements, new median islands, <br />landscaping, and signing and striping. Work consisted of preparation of Plans, Specifications <br />and Cost Estimate as well as bid and construction support. <br />Gene Autry Way Improvements, City of Anaheim, CA — Project Engineer assisting with the <br />final design services to improve Gene Autry Way and the west side of State College Boulevard <br />adjacent to the main Angel Stadium ingress/egress point. The project will widen both streets <br />to increase capacity while providing space for bicyclists and facilities for pedestrian circulation. <br />Multiple bio-retention facilities are being provided to comply with SWRCB requirements in north <br />Orange County. The project also includes R/W acquisition, necessary modifications to adjacent <br />properties, utility relocations, traffic signals, lighting, and special considerations related to Angel <br />Stadium event traffic. <br />Gensler i Santa Ana Regional Transportation Bike Station <br />