My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IDS GROUP, INC. (2)
Clerk
>
Contracts / Agreements
>
I
>
IDS GROUP, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 3:55:47 PM
Creation date
9/18/2018 2:17:16 PM
Metadata
Fields
Template:
Contracts
Company Name
IDS GROUP, INC.
Contract #
A-2018-185
Agency
Public Works
Council Approval Date
8/21/2018
Expiration Date
8/20/2021
Insurance Exp Date
11/12/2021
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electrical <br />Services for Various Park Locations <br />RFP No. 18-031 <br />Audie Murphy -Ranch Sports Complex and Skate Park, Menifee, CA: Provided electrical <br />design fora 11-acre park that features alighted skate park, baseball and soccer fields, basketball <br />court, tot lot and playground. Also features two restroom buildings and security cameras <br />throughout the park site. <br />George Bellis Park, Boisseranc Park and San Antonio Parks Sports Lighting Replacement, <br />Buena Park, CA: Provided electrical engineering design services for the upgrade of 43 existing <br />sports lighting poles with 188 new sports lights. In additional, added eight (8) new sports poles <br />with 40 new lights, added new automated lighting controls for all lights and replaced three (3) <br />existing electrical services and switchgear across three park sites. <br />Menifee Town Center Central Park, Menifee, CA: Provided electrical design for 5-acre park <br />with lighted parking lot, rest room building, multiple lighted picnic shelters with lockable electrical <br />outlets, splash pad water feature, landscape lighting, lighted walking paths, security cameras, <br />amphitheater with both 100-amps and 200-amp outdoor lockable event panels containing multiple <br />sized electrical outlets for live performances. <br />IDS' Project Team <br />Our Project Team consists of a Project Manager, a Principal -in -Charge and a Quality Assurance <br />Manager as well as team members for civil and cost estimating. IDS' Project Manager, Mr. <br />Michael Reed will be the primary point -of -contact for the City and has over 27 years of electrical <br />engineering experience in park/recreation, community center, municipal, street lighting, and <br />commercial projects. Michael can be reached at 949.387.8500 Ext. 328 or via email <br />Michael.reed@idsgi.com. <br />Mr. Reed will be responsible for the technical adequacy and design. Additionally, he will ensure <br />the project stays on schedule and within budget by managing staffing hours and expenses, <br />comparing these expenditures with the proposed budget and approved work scope- project <br />engineers and architects will report directly to Michael. This chain -of -command allows IDS to <br />maximize effectiveness and efficiency and ensure that assignments are completed on time, within <br />budget, and are of defensible quality. <br />Our organizational chart shows the project team, including key and support staff, their project <br />roles and how all members will work through Mr. Reed to communicate with the City. Resumes <br />for Michael and other staff members are included within this section. <br />As Project Manager, Mr. Reed will establish project responsibilities, organizational structure and <br />clear lines of reporting within the consulting team. Based on our experience in similar projects, <br />we have developed a clear and efficient management procedure for our services. Michael will: <br />• Develop the project schedule and monitor the progress of the project through standing team <br />meetings, and monitor the review budget at various stages. Provide progress reports and <br />facilitate the review of the work. <br />• Monitor the technical performance of the project team, ensure quality and consistency (QC), <br />and ensure detection and resolution of project performance issues before they become <br />problems. <br />AAA IDS GROUP Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.