Laserfiche WebLink
Electrical Lighting Design Services for Various Park Locations <br />RFP No. 18-031 <br />• Ensure that the City is clearly informed of the progress and status of the project. <br />• Enhance working relationships of team members and the City. <br />Subconsultants <br />All services can be performed in-house; therefore, IDS does not anticipated utilizing any <br />subconsultants for this contract. <br />Key Personnel Resumes <br />Full resumes of key personnel proposed to work on this project are provided Attachment A of this <br />proposal. <br />Staff Availability <br />The following is an estimate of the availability of our key personnel during the duration of this <br />project. The percentages of key staff availability shown are projected based on anticipated <br />workload. These percentages represent the average time available for a team member. Actual <br />time may vary depending on the project specifics. <br />Robin (Rob) O'Neil, PE 45% <br />Hassan (Hank) M. Bagheri, PhD, PE, LEED AP 30% <br />Michael Reed 40% <br />Peter Gambino, PE, PLS, QSD 45% <br />AAIDS GROUP Page 7 <br />