My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IDS GROUP, INC. (2)
Clerk
>
Contracts / Agreements
>
I
>
IDS GROUP, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 3:55:47 PM
Creation date
9/18/2018 2:17:16 PM
Metadata
Fields
Template:
Contracts
Company Name
IDS GROUP, INC.
Contract #
A-2018-185
Agency
Public Works
Council Approval Date
8/21/2018
Expiration Date
8/20/2021
Insurance Exp Date
11/12/2021
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electrical Lighting Design Services for Various Park Locations <br />RFP No. 18-031 <br />Section 2: Scope of Services and Schedule <br />The project scope involves the preparation of Construction Documents suitable for bidding and plan <br />check approval to include new electrical and security lighting systems for the following parks: <br />• Pacific Electric Bike Trail — (Phase 1) <br />• Saddleback View Park <br />Morrison Park. <br />Task 1: Preliminary Engineering: <br />Preliminary Engineering shall include one Kick-off meeting with City Staff to discuss scope of work, <br />project required tasks and objectives, potential elements and issues, and schedule. Preliminary <br />Engineering will also include field work and subsequent meetings with City staff as required for <br />preparation of site plans. <br />Engineering and Design required tasks include, but may not be limited to: <br />■ Identify the locations where all of the above ground equipment and light standards will be installed. <br />City shall provide topography maps. <br />■ Identify where all the underground utilities are located to eliminate field conflicts. Utilize in-house <br />Civil Engineering <br />■ Coordinate with Southern California Edison from application filing through construction and until <br />the installation is complete and system is energized from SCE. Proposal assumes electrical <br />service upgrade at Morrison Park. <br />Task 2: Design Development (30% plans) <br />Design development will involve the development of electrical system improvements for security lighting <br />as outlined in the preliminary engineering phase to address project required tasks and shall include <br />preliminary electrical engineering plans and cost estimate. Should project scope exceed available <br />budget, project plans/specifications will be value engineered or phased as appropriate. <br />Engineering and design required tasks shall include, but may not be limited to: <br />• Title Sheet (City provide template) <br />• Electrical & Lighting plans <br />• Photometrics <br />• Panel schedules <br />• Single line diagrams <br />• Details and notes <br />• Structural Calculations and details for lighting pole base foundations as required <br />• Preliminary Cost Estimation <br />Task 3: Construction Documents (85% and 100% plans) <br />Construction Documents shall include finalizing Design Development plans, obtaining plan check <br />approvals and securing permitting. This includes the provision of detailed engineering and construction <br />A, IDS GROUP Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.