Laserfiche WebLink
Electrical Lighting Design Services for Various Park Locations <br />RFP No, 18-031 <br />Provide periodic field reviews and bring to the attention of the City of Santa Ana any defects or <br />deficiencies in the work by the construction contractor which the Consultant may observe. The <br />Consultant shall have no authority to issue instruction on behalf of the City of Santa Ana, or to <br />deputize another to do so. <br />Be available as requested by the City to resolve discrepancies in the contract documents. <br />Consultant shall bring to the attention of the City any defects or deficiencies in the work by the <br />construction contractor which the Consultant may observe. Consultant shall have no authority to <br />issue instruction on behalf of the City, or to deputize another to do so. <br />Furnish, at the consultant's sole cost and expense, all necessary drawings for corrections and <br />change orders required by errors and omissions of the Consultant. Electronic files for the change <br />orders shall be submitted to the city for duplication and distribution. <br />Record Drawings / As -Built Plans: <br />Upon completion of construction, the record drawings kept by the General Contractor shall be <br />turned over to IDS for preparation of "as -built" plans. IDS shall incorporate all changes to the plans <br />electronically with all necessary revision notations. Once plans have been updated, an electronic <br />file shall be submitted to the City in Microstation V8i CADD and pdf formats of the final as -built <br />drawings via CD, e-mail, or through an FTP site. <br />City Responsibilities <br />The City will be responsible for the following items: <br />• Providing electronic topographic site plans as shown in Appendix, Attachment 5. <br />• Furnishing electronic design file with City title block and title sheet (24" x 36") <br />• Providing standard City boilerplate specification. <br />■ Processing plans for governmental agency approvals having jurisdiction over the project. <br />Providing support with the application process with Southern California Edison. <br />• Acting as a liaison with the appropriate decision making bodies, as necessary. <br />• Providing standard invoice template. <br />Special Requirements: <br />Morrison Park is funded with local funds; however, Pacific Electric Bike Trail and Saddleback View Park <br />are funded through the U.S. Department of Housing and Urban Development, Community Development <br />Block Grant Program (CDBG) and as such is subject to the conditions of the Funding Requirements. <br />Proposer shall comply with all requirements as the projects pertain to the use of these funds. Refer to <br />Attachment 4, included in the Appendix of this RFP. The Contract agreement for the two CDBG projects <br />may be separated from the non-CDBG project. <br />RAIDS GROUP Page 17 <br />