My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IDS GROUP, INC. (2)
Clerk
>
Contracts / Agreements
>
I
>
IDS GROUP, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 3:55:47 PM
Creation date
9/18/2018 2:17:16 PM
Metadata
Fields
Template:
Contracts
Company Name
IDS GROUP, INC.
Contract #
A-2018-185
Agency
Public Works
Council Approval Date
8/21/2018
Expiration Date
8/20/2021
Insurance Exp Date
11/12/2021
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electrical Lighting Design Services for Various Park Locations <br />RFP No, 18-031 <br />Provide periodic field reviews and bring to the attention of the City of Santa Ana any defects or <br />deficiencies in the work by the construction contractor which the Consultant may observe. The <br />Consultant shall have no authority to issue instruction on behalf of the City of Santa Ana, or to <br />deputize another to do so. <br />Be available as requested by the City to resolve discrepancies in the contract documents. <br />Consultant shall bring to the attention of the City any defects or deficiencies in the work by the <br />construction contractor which the Consultant may observe. Consultant shall have no authority to <br />issue instruction on behalf of the City, or to deputize another to do so. <br />Furnish, at the consultant's sole cost and expense, all necessary drawings for corrections and <br />change orders required by errors and omissions of the Consultant. Electronic files for the change <br />orders shall be submitted to the city for duplication and distribution. <br />Record Drawings / As -Built Plans: <br />Upon completion of construction, the record drawings kept by the General Contractor shall be <br />turned over to IDS for preparation of "as -built" plans. IDS shall incorporate all changes to the plans <br />electronically with all necessary revision notations. Once plans have been updated, an electronic <br />file shall be submitted to the City in Microstation V8i CADD and pdf formats of the final as -built <br />drawings via CD, e-mail, or through an FTP site. <br />City Responsibilities <br />The City will be responsible for the following items: <br />• Providing electronic topographic site plans as shown in Appendix, Attachment 5. <br />• Furnishing electronic design file with City title block and title sheet (24" x 36") <br />• Providing standard City boilerplate specification. <br />■ Processing plans for governmental agency approvals having jurisdiction over the project. <br />Providing support with the application process with Southern California Edison. <br />• Acting as a liaison with the appropriate decision making bodies, as necessary. <br />• Providing standard invoice template. <br />Special Requirements: <br />Morrison Park is funded with local funds; however, Pacific Electric Bike Trail and Saddleback View Park <br />are funded through the U.S. Department of Housing and Urban Development, Community Development <br />Block Grant Program (CDBG) and as such is subject to the conditions of the Funding Requirements. <br />Proposer shall comply with all requirements as the projects pertain to the use of these funds. Refer to <br />Attachment 4, included in the Appendix of this RFP. The Contract agreement for the two CDBG projects <br />may be separated from the non-CDBG project. <br />RAIDS GROUP Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.