City of Santa Ana <br />Impact Statement Impact Summary Findings <br />Impact 4.2-E4: Construction of the Elan Project <br />could result in the disturbance of human <br />remains interred outside of formal cemeteries. <br />The Elan Project area's location is unlikely to <br />producing human remains interred outside of <br />formal cemeteries during ground -disturbing <br />construction activities associated with the <br />project. However, it remains possible that <br />human remains could be discovered during <br />construction of the Elan Project. <br />2. CEQA Findings <br />paleontological resources from implementation <br />of the proposed project would be less than <br />significant. <br />Finding 1. Changes or alterations have been <br />required in, or incorporated into the project <br />which avoid, substantially lessen, or reduce the <br />magnitude of the significant environmental <br />effect. <br />Implementation of mitigation measure MM -OZ <br />4.4-5 from the MEMU EIR would ensure that <br />any impacts on human remains would be <br />reduced to less than significant. <br />Hazards and Hazardous Materials <br />Impact 4.4-E2: Construction activities There is a possibility that historic land uses at Finding 1. Changes or alterations have been <br />associated with implementation of the Elan the site could pose a hazardous materials required in, or incorporated into the project <br />Project could result in the release of hazardous exposure risk during construction activities. which avoid, substantially lessen, or reduce the <br />materials to the environment through magnitude of the significant environmental <br />reasonably foreseeable upset and accident effect. <br />conditions. <br />Impact 4.4-E5: Development of the Elan <br />Project could interfere with an adopted <br />emergency response plan or emergency <br />evacuation plan. <br />Implementation of the Elan Project would not <br />result in any substantial traffic queuing along <br />major arterials surrounding the project area. <br />Large construction vehicles entering and exiting <br />construction sites would be guided by the use of <br />personnel using signs and flags to direct traffic. <br />Implementation of mitigation measures MM -OZ <br />4.6-2 and MM -OZ 4.6-3 would reduce potential <br />exposure impacts by requiring additional <br />investigation and subsequent remediation if <br />contamination is confirmed to be less than <br />significant. <br />Finding 1. Changes or alterations have been <br />required in, or incorporated into the project <br />which avoid, substantially lessen, or reduce the <br />magnitude of the significant environmental <br />effect. <br />Adequate emergency access would be assured <br />via implementation of mitigation measures <br />MM -OZ 4.6-5 and MM -OZ 4.6-6 from the <br />Metro East Mixed -Use Overlay District Expansion and Elan August 2018 <br />Development Projects 2-15 ICF 19.18 <br />Findings of Fact/Statement of Overriding Considerations <br />