City of Santa Ana <br />Mitigation Monitoring and Reporting Program <br />Mitigation <br />Implementing Mitigation <br />Measure No. Mitigation Measure <br />Monitoring Party Party Timing <br />Ana Fire Department). If needed, a Site Health and Safety Plan that meets <br />Occupational Safety and Health Administration requirements shall be prepared <br />and in place prior to commencement of work in any contaminated area. <br />MM -OZ 4.6-5 Prior to initiation of construction activities, any development within the Overlay <br />Public Works Project Prior <br />Zone shall have a completed traffic control plan, prepared by the developer that <br />applicant to/during <br />will be implemented during construction activities. This may include, but is not <br />construction <br />limited to, the maintenance of at least one unobstructed lane in both directions <br />on surrounding roadways. At any time only a single lane is available, the <br />developer shall provide a temporary traffic signal, signal carriers (i.e. <br />flagpersons), or other appropriate traffic controls to allow travel in both <br />directions. If construction activities require the complete closure of a roadway <br />segment, the developer should provide appropriate signage indicating <br />alternative routes. <br />MM -OZ 4.6-6 The City Planning Department shall consult with the Santa Ana Police <br />Planning and Planning and Prior <br />Department and the Santa Ana Fire Department to disclose temporary closures <br />Building Building to/during <br />and alternative travel routes in order to ensure adequate access for emergency <br />Agency/Police Agency construction <br />vehicles when construction of future projects would result in temporary land or <br />Dept./Fire Dept. <br />roadwav closures. <br />MM -OZ 4.7-1 In order to comply with the 2003 DAMP, future development projects in the Public Works Project Prior to <br />Overlay Zone shall prepare Storm Drain Plans, Stormwater Pollution Prevention applicant issuance of <br />Plans (SWPPP), and Water Quality Management Plans (WQMP) conforming to permits <br />the current National Pollution Discharge Elimination System (NPDES) <br />requirements, prepared by a Licensed Civil Engineer or Environmental <br />Engineer, shall be submitted to the Department of Public Works for review and <br />approval. <br />(a) SWPPP shall be prepared and updated as needed during the course of <br />construction to satisfy the requirements of each phase of the development. <br />.The plan shall incorporate all necessary Best Management Practices (BMPs) <br />and other City requirements to eliminate polluted runoff until all <br />construction work for the project is completed. The SWPPP shall include <br />treatment and disposal of all dewatering operations flows, and for nuisance <br />flows durine construction. <br />Metro East Mixed -Use Overlay District Expansion and Elan Development Projects 31 August 2018 <br />ICF 00019.18 <br />