Laserfiche WebLink
City of Santa Ana <br />Mitigation Monitoring and Reporting Program <br />Mitigation <br />Measure No. Mitigation Measure <br />Implementing Mitigation <br />Monitoring Party Party Timing <br />• Ensure that construction equipment is properly muffled according to <br />industry standards and be in good working condition. <br />• Place noise -generating construction equipment and locate construction <br />staging areas away from sensitive uses, where feasible. <br />• Schedule high noise -producing activities between the hours of 8:00 A.M. <br />and 5:00 P.M. to minimize disruption on sensitive uses. <br />Implement noise attenuation measures to the extent feasible, which may <br />include, but are not limited to, temporary noise barriers or noise blankets <br />around stationary construction noise sources. <br />Use electric air compressors and similar power tools rather than diesel <br />equipment, where feasible. <br />Construction -related equipment, including heavy-duty equipment, motor <br />vehicles, and portable equipment, shall be turned off when not in use for <br />more than 30 minutes. <br />Construction hours, allowable workdays, and the phone number of the job <br />superintendent shall be clearly posted at all construction entrances to allow <br />for surrounding owners and residents to contact the job superintendent. If <br />the City or the job superintendent receives a complaint, the superintendent <br />shall investigate, take appropriate corrective action, and report the action <br />taken to the reporting party. <br />Contract specifications shall be included in the proposed project construction <br />documents, which shall be reviewed by the City prior to issuance of a grading <br />permit. <br />MM -OZ 4.9-3 The project applicant shall require by contract specifications that construction <br />Planning and Project Prior to <br />staging areas along with the operation of earthmoving equipment within the <br />Building Agency applicant issuance of <br />project area would be located as far away from vibration and noise sensitive <br />grading <br />sites as possible. Contract specifications shall be included in the proposed <br />permit <br />project construction documents, which shall be reviewed by the City prior to <br />issuance of a grading permit. <br />MM -OZ 4.9-4 The project applicant shall require by contract specifications that heavily loaded Planning and Project Prior to <br />trucks used during construction would be routed away from residential streets Building Agency applicant issuance of <br />to the extent feasible. Contract specifications shall be included in the proposed grading <br />project construction documents, which shall be reviewed by the City prior to permit <br />issuance of a grading permit. <br />Metro East Mixed -Use Overlay District Expansion and Elan Development Projects 33 August 2018 <br />ICF 00019.18 <br />