My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KMEA
Clerk
>
Contracts / Agreements
>
K
>
KMEA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:45:07 PM
Creation date
10/8/2018 1:58:05 PM
Metadata
Fields
Template:
Contracts
Company Name
KMEA
Contract #
A-2018-190
Agency
PUBLIC WORKS
Council Approval Date
8/21/2018
Expiration Date
8/20/2021
Insurance Exp Date
5/19/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
© KMEA <br />• Time spent on site for completion of Phase I ESA surveys or Hazardous Materials Surveys will generally not exceed one <br />half day to a full business day. Additional time, if deemed necessary, will be based on receiving prior approval from the <br />City and will be charged in accordance with the labor rates provided in the KMEA's current Fee Schedule for Professional <br />Environmental Consulting Services accompanying this proposal. <br />• Site reconnaissance activities will be scheduled during normal business days and hours. <br />• The City will help KMEA in receiving approval from the site owner(s) and/or owner representative(s) to collect necessary <br />bulk samples from building materials and other appurtenances, as required. The nature of this sampling work is intrusive <br />and will involve making nominal size incisions or cuts to allow collecting the bulk samples for laboratory analysis. Paint <br />chip samples necessary for lead evaluations will require incisions to scrape off layer(s) of paint as part of the sampling <br />process. <br />• Hazardous wastes or hazardous materials found or identified by KMEA personnel at a site being surveyed as part of these <br />surveys will remain the property of the site owner/operator and KMEA will not accept any ownership responsibility for such <br />materials. <br />• All site reconnaissance work will be completed during a single mobilization. Additional mobilizations due to unforeseen <br />circumstances outside of KMEA's control will result in incurring additional fees. <br />• One final report in hard copy format along with a digital copy on CD will be issued upon completion of each survey or <br />investigation. Additional report copies, if desired in electronic format or hard copy format, may be produced upon request <br />by the City at additional cost. <br />• Additional professional labor hours requested by the City in excess of the normal time generally required and allotted for <br />conducting the specified surveys with the outlined corresponding scope of work including the preparation of pertinent <br />documents and reports will result in incurring additional costs. Such additional professional labor hours include but may <br />not be limited to consultation with the legal counsel, preparation for and attendance at meetings, etc. Fees associated with <br />such services, if desired by the City, will be assessed in accordance with labor rates reflected in the KMEA's current Fee <br />Schedule for Professional Environmental Consulting Services accompanying this proposal. <br />• The reports prepared by KMEA for the City under this contract will be for the sole use of the City and its authorized agents. <br />Preparation of a third party "Reliance Letter" for the purposes of official use by other such parties may be requested by the <br />City. Third party reliance letters, may at KMEA's discretion, be issued upon request by the City at additional costs in <br />accordance with labor rates reflected in the KMEA's current Fee Schedule for Professional Environmental Consulting <br />Services accompanying this proposal. <br />• Site reconnaissance activities will be scheduled during normal business days and hours. <br />• No sampling will be conducted during Phase I ESAs. <br />• No intrusive work or sampling of any nature is conducted during a Phase I ESA. <br />• Hazardous wastes or hazardous materials found or identified by KMEA personnel during site surveys and investigations <br />under this contract will remain the property ofthe site owner/operator and KMEAwill not accept any ownership responsibility <br />for such materials. <br />• Agency file review on location, if deemed necessary as part of the Phase I ESAs, is normally conducted following <br />identification of RECs that require such review and will only be conducted with prior consent with the City. Maximum allotted <br />number of labor hours for coordination and completion of agency file review is limited to four hours per Phase I ESA study. <br />Additional hours, if required, will be spent upon receiving verbal authorization form the City, according to the labor rates <br />reflected in the KMEA's current Fee Schedule for Professional Environmental Consulting Services accompanying this <br />proposal. <br />City of Santa Ana Page 91 June 5, 2018 <br />Various Environmental Services <br />RFP NO.: 18-043 <br />
The URL can be used to link to this page
Your browser does not support the video tag.